Download this document in MS Word format


AutoFill Template

Journal of the Senate

________________

Tuesday, May 1, 2007

The Senate was called to order by the President.

Devotional Exercises

A moment of silence was observed in lieu of devotions.

Message from the House No. 66

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:

Mr. President:

I am directed to inform the Senate the House has considered Senate proposal of amendment to House bill of the following title:

H. 296.  An act relating to potable water supply and wastewater system permitting.

And has refused to concur therein and asks for a Committee of Conference upon the disagreeing votes of the two Houses;

And the Speaker has appointed as members of such Committee on the part of the House

                                         Rep. Johnson of Canaan

                                         Rep. Deen of Westminster

                                         Rep. McCullough of Williston

The Governor has informed the House of Representatives that on the twenty-seventh day of April, 2007, he approved and signed a bill originating in the House of the following title:

H. 528.  An act relating to approval of amendment to the charter of the City of Montpelier.

Joint Resolution Placed on Calendar

J.R.S. 35.

Joint Senate resolution of the following title was offered, read the first time and is as follows:

     By Senator Flanagan,

J.R.S. 35.  Joint resolution urging Congress to adopt the Breast Cancer Patient Protection Act of 2007.

Whereas, breast cancer is a serious illness that is the second leading cause of death among women in the United States, and

Whereas, it is estimated that in the United States, there will be approximately 178,000 new incidents of breast cancer this year, and that roughly 40,000 deaths will be attributed to this disease, and

Whereas, one medically viable, although emotionally difficult, option for some women who have contracted breast cancer is mastectomy surgery during which a breast is removed with the intent of also removing the cancer before it can spread further in the body, and

Whereas, although the techniques to perform this surgery have improved considerably in the last decade, it remains a serious operation; and ideally patients should be permitted to remain hospitalized for at least a brief post‑operative period of time in order that their immediate recovery can be monitored for complications, and

Whereas, contrary to this common‑sense approach, insurance companies are increasingly confining their coverage for breast cancer treatments and only authorizing mastectomy surgeries to be performed on an outpatient basis, and

Whereas, in order to reverse this unacceptable trend, members of Congress, from both the House and Senate, including Representative Jo Ann Davis of Virginia, the bill’s original sponsor and one who has experienced breast cancer personally, are sponsoring in their respective chambers, H.R.758/S.459, each of which is known as the Breast Cancer Patient Protection Act of 2007, and

Whereas, the bill, as introduced in both chambers, would “require that health plans provide coverage for a minimum hospital stay for mastectomies, lumpectomies and lymph node dissection for the treatment of breast cancer and coverage for secondary consultations,” and     

Whereas, both versions would require a minimum coverage period for mastectomy and lumpectomy surgery of 48 hours and a 24‑hour minimum coverage period for lymph node dissection, and

Whereas, American women and, indeed, American men who, as shown in the recent well‑publicized case of former United States Senator Edward Brooke, can contract breast cancer, should not be denied comprehensive treatment because insurance companies are denying complete coverage for post-operative care and other procedures related to this illness, now therefore be it

Resolved by the Senate and House of Representatives:

That the General Assembly urges Congress to adopt the Breast Cancer Patient Protection Act of 2007, and be it further

Resolved:  That the Secretary of State be directed to send a copy of this resolution to the members of the Vermont Congressional delegation and to the Vermont office of the New England Division of the American Cancer Society in Williston.

Thereupon, in the discretion of the President, under Rule 51, the joint resolution was placed on the Calendar for action tomorrow.

Proposals of Amendment; Bill Passed in Concurrence with Proposal of Amendment

H. 537.

House bill entitled:

An act relating to making appropriations for the support of state government.

Was taken up.

Thereupon, pending third reading of the bill, Senator Bartlett on behalf of the Committee on Appropriations moved to amend the bill as follows:

     First:  At the end of Sec. 56 by adding a new subsection (d) to read as follows:

     (d)  An amount not to exceed the amount available in other short term general fund reserves is appropriated to the attorney general for payment of legal costs and charges arising from settlements of completed legal actions. 

     Second:  In Sec. 120(i), by striking out the last sentence in its entirety and inserting in lieu thereof a new last sentence to read as follows:  If available this appropriation shall be used for tobacco programs as recommended by the Vermont tobacco control board. 

     Third:  In Sec. 130(a), by striking out the figure “$485,000” and inserting in lieu thereof the figure $692,000

     Fourth:  At the end of Sec. 206, by adding a new subsection (a) to read as follows: 

     (a)  The commissioner of the department of forests, parks, and recreation shall allocate a minimum of $10,000 of the funds appropriated to this department for the eradication and control of buckthorn.  The commissioner shall seek other sources of funding for this effort including additional allocations within this budget.  In order to mitigate the threat this invasive species poses to the forest products industry in Vermont, the commissioner shall submit a report to the general assembly by January 15, 2008. The report shall include a long term plan for eradication and control of buckthorn and the estimated annual budget needed to implement the plan and any potential sources that may be available.

     Fifth:  By striking out Sec. 290 in its entirety and inserting in lieu thereof a new Sec. 290 to read as follows:

Sec. 290.  2007 MUNICIPAL NET EDUCATION FUND PAYMENTS

     (a)  In determining net education tax payments of a municipality under sections 4011 and 4028 of Title 16 for September 10, 2007, the commissioner of education shall include in the accounting of the net amount all education funds paid to the municipality under section 6066a of Title 32 on July 1, 2007; and in determining net education tax payments of a municipality under sections 4011 and 4028 of Title 16 for December 10, 2007, the commissioner of education shall include in the accounting of the net amount all education funds paid to the municipality under section 6066a of Title 32 on September 15, 2007.  The commissioner shall include any education fund payments made to a municipality under subsection 6066a(c) after September 15, 2007, in the first accounting of a net amount thereafter.  In a manner consistent with section 426 of Title 16, the municipality shall transfer to its school district or districts or shall return to the state all education funds received by the municipality from the state under section 6066a of Title 32 within 20 days of the first date upon which taxes become due and payable or 20 days after notification by the commissioner of education, whichever is later.  The commissioner shall notify the town of the amounts due to the school district and the state.

Which was agreed to.

Thereupon, pending third reading of the bill, Senators Carris, Maynard and Mullin moved to amend the Senate proposal of amendment in Sec. 5, subsection (a), in the second sentence by striking out the following: “approved by March 1” and inserting in lieu thereof the following: submitted by May 1

Which was agreed to.

Thereupon, pending third reading of the bill, Senator White moved to amend the Senate proposal of amendment by adding a new section to be numbered Sec. 71a to read as follows:

Sec. 71a.  20 V.S.A. § 38(a)(3) is amended to read:

(3)  The annual budget shall include anticipated expenditures to municipalities, county or state agencies, or other organizations necessary to support the radiological emergency response plan. The annual budget shall also include an annual base payment of no less than $5,000.00 for each town within the emergency planning zone for radiological emergency response- related expenditures and $4,500 for each town for pager stipends. Additional expenditures by the municipalities in the emergency planning zone, the Windham regional planning commission, and any other municipality or emergency planning zone entity defined by the state as required to support the plan shall be determined during the budget development process established by this section. The annual budget so prepared shall include all costs for evacuation notification systems.

Which was agreed to.

Thereupon, pending third reading of the bill, Senator Condos moved to amend the Senate proposal of amendment in Sec. 153a, by adding a new subsection (d) to read:

(d)  In developing the plan required by this section, the department of corrections shall consult with the police chiefs, sheriff, and state’s attorney of Chittenden County regarding the impacts of having no facility for incarcerating or detaining the male population in Chittenden County, and the plan shall include a proposal to address these impacts. 

Which was agreed to.

Thereupon, pending third reading of the bill, Senator Kitchel moved to amend the Senate proposal of amendment in Sec. 28, by adding a new subsection (a) to read as follows:

     (a)  The department of buildings and general services and the Caledonia county side judges shall work together to determine a rental rate for the county use of the St. Johnsbury courthouse space that is mutually acceptable.

Which was agreed to.

     Thereupon, pending third reading of the bill, Senator Flanagan moved to amend the Senate proposal of amendment in by adding a new section to be numbered Sec. 152a to read as follows:

Sec. 152a.  TRAUMATIC BRAIN INJURY STUDY COMMITTEE

(a)  A committee of the following is members is created: one member of the house committee on human services, appointed by the speaker of the house; one member of the senate committee on health and welfare, appointed by the committee on committees; four representatives of the agency of human services from the department of disabilities, aging, and independent living, the department of mental health, the division of developmental services, and the traumatic brain injury program, appointed by the secretary of human services; and one physician and one member of the psychiatric or mental health treatment community, appointed by the governor.

(b)  The committee shall evaluate the nature and scope of the need of Vermonter’s for help in performing activities of daily living as a result of traumatic brain injury, depression, anxiety, stroke, Alzheimer’s, postpartum depression, and addiction.  The committee shall also analyze insurance coverage for these conditions.

(c)  The committee may meet up to four times and file a report of its recommendations by December 15, 2007.

(d)  Members of the general assembly shall be entitled to the same per diem compensation and reimbursement for necessary expenses as those provided to members of standing committees under section 406 of Title 2.

Which was agreed to.

Thereupon, pending third reading of the bill, Senator Condos moved to amend the Senate proposal of amendment in Sec. 293b(a) in the third sentence by striking out the following: “2008” and inserting in lieu thereof the following: 2009

Thereupon, pending the question, Shall the Senate proposal of amendment be amended as recommended by Senator Condos?, Senator Condos requested and was granted leave to withdraw the proposal of amendment.

     Which was agreed to.

     Thereupon, pending third reading of the bill, Senator Mazza moved to amend the Senate proposal of amendment in Sec. 277, after subdivision (15) by inserting a new subdivision (16) to read as follows:

          (16)  Sixteenth, $300,000 is appropriated to the department of public safety for increasing the number of replacement fleet vehicles.

     And by renumbering the remaining subdivision to be numerically correct.

Which was agreed to.

Thereupon, the bill was read the third time and passed in concurrence with proposal of amendment on a roll call, Yeas 29, Nays 1.

Senator Bartlett having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Ayer, Bartlett, Campbell, Carris, Collins, Condos, Coppenrath, Cummings, Doyle, Flanagan, Giard, Hartwell, Illuzzi, Kitchel, Kittell, Lyons, MacDonald, Maynard, Mazza, McCormack, Miller, Nitka, Racine, Scott, Sears, Shumlin, Snelling, Starr, White.

The Senator who voted in the negative was: Mullin.

Proposals of Amendment; Third Reading Ordered; Rules Suspended; Bill Passed in Concurrence with Proposal of Amendment

H. 521.

Senator Cummings, for the Committee on Finance, to which was referred House bill entitled:

An act relating to miscellaneous substantive tax amendments.

Reported recommending that the Senate propose to the House to amend the bill as follows:

First:  By adding a new section to be numbered Sec. 10 to read as follows:

Sec. 10.  32 V.S.A. § 3481(1) is amended to read:

(1)  “Appraisal value” shall mean, with respect to property enrolled in a use value appraisal program, the use value appraisal as defined in subdivision 3752(12) of this title, multiplied by the common level of appraisal, and with respect to all other property, the estimated fair market value.  The estimated fair market value of a property is the price which the property will bring in the market when offered for sale and purchased by another, taking into consideration all the elements of the availability of the property, its use both potential and prospective, any functional deficiencies, and all other elements such as age and condition which combine to give property a market value. Those elements shall include a consideration of a decrease in value in non‑rental residential property due to a housing subsidy covenant as defined in section 610 of Title 27, or the effect of any state or local law or regulation affecting the use of land, including but not limited to chapter 151 of Title 10 or any land capability plan established in furtherance or implementation thereof, rules adopted by the state board of health and any local or regional zoning ordinances or development plans.  In determining estimated fair market value, the sale price of the property in question is one element to consider, but is not solely determinative.

For residential rental property that is subject to a housing subsidy covenant or other legal restriction, imposed by a governmental, quasi‑governmental, or public purpose entity, on rents that may be charged, fair market value shall be determined by an income approach using the following elements:

(A)  market rents with utility allowance adjustments for the geographic area in which the property is located as determined by the federal office of Housing and Urban Development or in the case of properties authorized under 42 U.S.C. § 1437, 12 U.S.C. § 1701q, 42 U.S.C. § 1485, 12 U.S.C. § 1715z‑1, 42 U.S.C. § 1437f, and 24 CFR Part 882 Subpart D and E, the higher of contract rents (meaning the amount of federal rental assistance plus any tenant contribution) and HUD market rents;

(B)  actual expenses incurred with respect to the property as which shall be provided by the property owner in a format acceptable to the commissioner and certified by an independent third party, such as a certified public accounting firm or public or quasi‑public funding agency;

(C)  a vacancy rate that is 50 percent of the market vacancy rate as determined by the United States Census Bureau with local review by the Vermont housing finance agency; and

(D)  a capitalization rate that is typical for the geographic area determined and published annually prior to April 1 by the division of property valuation and review after consultation with the Vermont housing finance agency.

Second:  By adding a new section to be numbered Sec. 11 to read as follows:

Sec. 11.  EXTENSION OF GRANDFATHERED EDUCATION PROPERTY TAX EXEMPTIONS FROM 1997

      Property tax exemptions authorized before July 1, 1997, under a municipal tax stabilization agreement, charter provision or vote of a municipality, still in effect on June 30, 2007, and qualified as exemptions affecting the education property tax grand list under 32 V.S.A. § 5404a(a), shall continue to affect the education property tax grand list under that section through June 30, 2008.

Third:  By adding eleven new sections to be numbered Secs. 12 through 22 to read as follows:

Sec. 12.  32 V.S.A. § 5404a(b) is amended to read:

(b)  An agreement affecting the education property tax grand list defined under subsection (a) of this section shall reduce the municipality’s education property tax liability under this chapter for the duration of the agreement or exemption without extension or renewal, and for a maximum of ten years, subject to the provisions of subsection 5930b(f) of this title. A municipality’s property tax liability under this chapter shall be reduced by any difference between the amount of the education property taxes collected on the subject property and the amount of education property taxes that would have been collected on such property if its fair market value were taxed at the equalized nonresidential rate for the tax year.

Sec. 13.  32 V.S.A. § 5404a(e) is amended to read:

(e)  Allocations.  A municipality on behalf of a person may apply to the Vermont economic progress council for an allocation of the education grand list value for up to ten years, of a portion of the increase in the value and liability assessed under section 5402 of this title on new economic development that is subsequently approved by the Vermont economic progress council pursuant to this section and subsections 5930a(c) and (d) of this title. The allocation may be awarded for up to ten years, subject to the provisions of subsection § 5930b(f) of this title.  Allocation to a municipality pursuant to this subsection shall be in addition to any other payments to the municipality under chapter 133 of Title 16.  If allocated, the allocated portion of the education fund liability shall be used by the municipality for infrastructure that includes wastewater treatment, water supply, transportation, and telecommunications and utility connections.

Sec. 14.  32 V.S.A. § 5930a(b) is amended to read:

(b)  The Vermont economic progress council, within 60 days of receipt of a complete application, shall approve or deny the following economic incentives:

(1)  tax stabilization agreements and exemptions under subdivision 5404a(a)(2) of this title;

(2)  applications for allocation to municipalities of a portion of education grand list value and municipal liability from new economic development under subsection 5404a(e) of this title; and

(3)  the Vermont employment growth incentives (VEGI) under section 5930b of this title.

(4)  the tax increment financing (TIF) district program as established in section 5404a of this title.

All incentives are subject to application of the incentive ratio as determined under section 5930b(b)(3) of this title and no tax stabilization agreement, exemption or allocation shall be approved except in conjunction with the approval of an incentive under subdivision (3) of this subsection.

Sec. 15.  32 V.S.A. § 5930a(d) is amended to read:

(d)  The council shall apply the cost‑benefit model in reviewing applications under subdivisions (b)(1), (2), and (3) of this section to determine the net fiscal benefit to the state.  The cost‑benefit model shall be a uniform and comprehensive methodology for assessing and measuring the projected net fiscal benefit or cost to the state of proposed economic development activities over the five‑year award period.  Any modification of the cost‑benefit model shall be subject to the approval of the joint fiscal committee.  The cost‑benefit analysis shall include consideration of the effect of the passage of time and inflation on the value of multi‑year fiscal benefits and costs.

(1)  In determining the projected net fiscal benefit or cost of the incentives considered under subdivisions (b)(1) and (2) of this section, the council shall calculate the net present value of the enhanced or forgone statewide education tax revenues, reflecting both direct and indirect economic activity.  If the council approves an incentive pursuant to this section, the net fiscal costs, if any, to the state shall be counted as if all those costs occurred in the year in which the council first approved the incentive and that cost shall reduce the amount of the annual authorization for such approvals established by the legislature for the applicable calendar year.

(2)  In determining the projected net fiscal benefit or cost of the incentives considered under subdivision (b)(3) of this section, the council shall calculate the net present value of the enhanced or forgone state tax revenues attributable to the incentives, reflecting both direct and indirect economic activity over the five‑year award period.  If the council approves an incentive, the net fiscal costs, if any, to the state shall be counted as if all of those costs occurred in the year in which the council first approved the incentive and that cost shall reduce the amount of the council's annual authorization for approval of economic incentives as established by the legislature for the applicable calendar year.

Sec. 16.  REPEAL

32 V.S.A. § 5930b(a)(12) (definition of “incremental payroll”) is repealed.

Sec. 17.  32 V.S.A. § 5930b(a)(16) is amended to read:

(16)  “Payroll target” means the projected qualifying payroll Vermont gross wages and salaries for qualifying jobs in an award period year as reported on the Vermont employment growth incentive application.

Sec. 18.  32 V.S.A. § 5930b(a)(17) is amended to read:

(17)  “Payroll threshold” means base payroll or application base payroll (if year 1), plus expected average industry payroll growth as determined by the cost‑benefit model.


Sec. 19.  32 V.S.A. § 5930b(a)(21) is amended to read:

(21)  “Qualifying payroll” means actual annualized Vermont gross wages and salaries paid for qualifying jobs created in or carried forward to a utilization period the award period year, provided incremental payroll in that year equals or exceeds such gross wages that:

(A)  award period year base payroll; minus

(B)  Vermont gross wages and salaries paid for new qualifying jobs created in or carried forward to the award period year; equals or exceeds

(C)  prior‑year base payroll minus any carry‑forward of qualifying payroll under subdivision (c)(4) of this section, plus award‑year payroll threshold.

Sec. 20. 32 V.S.A. § 5930b(c) is amended to read:

(c)  Claiming an employment growth incentive.

(1)  A business whose application is approved and, in any year during the award period, meets or exceeds its payroll target and either its jobs or capital investment target may file an annual return claiming incentives pursuant to this section.  Upon approval by the department of taxes, incentive payments will be issued by the department of taxes calculated for each of the five award period years in equal annual installments.  The department of taxes will disburse the incentives over consecutive five‑year periods, beginning with each award period year, provided that the incentive‑triggering award period year payroll and job targets are maintained in each utilization period year for which an installment is claimed.

(2)  Incentives shall be calculated and disbursed as follows:  Qualifying payroll for the utilization award period year, not to exceed the payroll target or targets reduced by the payroll threshold for the incentive‑triggering award period year or years shall be multiplied by the incentive percentage.   Up to one‑fifth of the total incentive amount shall be disbursed in the first of five consecutive utilization period years, to the extent the full amount of qualifying payroll was actually paid in that year.  A full one‑fifth of the total incentive amount shall be disbursed in each of the remaining four consecutive utilization period years, provided that incentive‑triggering targets are maintained.

***

(4)  Qualifying jobs, qualifying capital investment, and qualifying payroll in excess of the jobs, capital investment, and payroll targets for an award year shall be carried forward and counted toward future award period year targets, provided such excess jobs, investment and payroll are maintained.

(5)  A business whose application is approved and, in the first award period year, fails to meet or exceed its payroll target and one out of two of its jobs and capital investment targets shall forfeit all authority to earn and claim incentives under this section.  The department of taxes shall notify the Vermont economic progress council that the first year award period targets have not been met, and the council shall rescind the incentive authorization in its entirety. A business whose incentive authorization is rescinded for failure to meet first‑year award period targets may reapply to the Vermont economic progress council for a new authorization pursuant to this section.

* * *

Sec. 21. 32 V.S.A. § 5930b(f) is added to read:

(f)  The property of a business whose authority to earn, apply or retain incentives under this section has been revoked is ineligible for property tax stabilization under subdivision 5404a(a)(2) of this title or allocation of property tax value under subsection 5404a(e) of this title for any education property tax grand list after the date of revocation.

Sec. 22.  EFFECTIVE DATE

Secs. 11 through 21 (Vermont Employment Growth Incentive technical amendments conforming to Act 184) of this act shall apply to claims filed in 2007 and after.

Fourth:  By adding a section to be numbered Sec. 23 to read as follows:

Sec. 23.  32 V.S.A. § 5930ee is amended to read:

§ 5930ee.  LIMITATIONS

Beginning in fiscal year 2007 2008 and thereafter, the state board may award tax credits to all qualified applicants under this subchapter, provided that:

(1)  The total amount of tax credits awarded annually, together with sales tax reallocated under section 9819 of this title, does not exceed $1,500,000.00  $1,600,000.00.

* * *

Fifth:  By adding two new sections to be numbered Secs. 24 and 25 to read as follows:

Sec. 24.  32 V.S.A. § 6066a(g) is added to read:

(g)  Upon transfer of a residence, the parties' proration of current‑year taxes shall be based upon the adjusted property tax, unless the parties otherwise agree.  No reimbursement by the transferee to the transferor for any property tax adjustment in the property tax year following the transfer shall be required unless the parties otherwise agree.

Sec. 25.  REPEAL

     32 V.S.A. § 6066(f) (proration of taxes shall be based upon the unadjusted property tax) is repealed as of January 1, 2007.

Sixth:  By striking out Sec. 7 in its entirety and inserting in lieu thereof a new Sec. 7 to read as follows:

Sec. 7.  32 V.S.A. § 9741(29) is amended to read:

(29)  Aircraft, including depreciable parts, machinery and equipment to be installed as a capital asset in such aircraft, sold to a person which holds itself out to the general public as engaging in air commerce, for use primarily in the carriage of persons or property for compensation or hire; and parts, machinery, and equipment to be installed in an aircraft.

Seventh:  By adding a new section to be numbered Sec. 26 to read as follows:

Sec. 26.  32 V.S.A. § 10002(o) is added to read:

      (o)  Also excluded from the definition of land is the land sold to an organization that qualifies under Section 501(c)(3) of the Internal Revenue Code and also meets the “public support” test of Section 509(a)(2) of the Code, if one of the stated purposes of the organization is to provide affordable housing and if the land is sold by the organization within 12 months of the transfer to the organization to a buyer in a transfer which meets all the requirements of subsection (b) of this section. 

(1)  If the organization fails to transfer the land within 12 months, or transfers it within 12 months but not to a buyer for occupancy as the buyer's principal residence,  then the organization shall become liable for the land gains tax due on the original transfer of the land to the organization and for the land gains tax on the transfer by the organization; and

(2)  If the organization transfers the land within 12 months, but at the time of the transfer by the organization there is no dwelling on the land completed and fit for occupancy, and the buyer fails to complete and occupy a principal residence on the land within two years of purchase from the organization, then the organization shall become liable for the land gains tax due on the original transfer of the land to the organization, and the buyer who purchased the land from the organization shall become liable for the land gains tax due on the transfer from the organization to the buyer.

Eighth:  By adding two new sections to be numbered Secs. 27 and 28 to read as follows:

Sec. 27.  24 V.S.A. § 138(a) and (d) are amended to read:

(a)  Local option taxes are authorized under this section for the purpose of affording municipalities an alternative method of raising municipal revenues to facilitate the transition and reduce the dislocations in those municipalities that may be caused by reforms to the method of financing public education under the Equal Educational Opportunity Act of 1997.  Accordingly:

(1)  the local option taxes authorized under this section may be imposed by a municipality; and

(2)  if a municipality opting opts to impose a local option tax may do so prior to July 1, 1998 to be effective beginning January 1, 1999, and anytime after December 1, 1998 a, the local option tax shall be effective beginning on the next tax quarter following 90 days' notice to the department of taxes of the imposition; and

(3)  a local option tax may only be adopted by a municipality in which:

(A)  the education property tax rate in 1997 was less than $1.10 per $100.00 of equalized education property value; or

(B)  the equalized grand list value of personal property, business machinery, inventory, and equipment is at least ten percent of the equalized education grand list as reported in the 1998 Annual Report of the Division of Property Valuation and Review; or

(C)  the combined education tax rate of the municipality will increase by 20 percent or more in fiscal year 1999 or in fiscal year 2000 over the rate of the combined education property tax in the previous fiscal year.

(d)  Of the taxes Taxes collected under this section, shall be paid as follows:

(1)  70 percent of the taxes shall be paid on a quarterly basis to the municipality in which they were collected, after reduction for the costs of administration and collection under subsection (c) of this section.  Revenues received by a municipality may be expended for municipal services only, and not for education expenditures.  Any remaining revenue shall be deposited into the PILOT special fund established by 32 V.S.A. § 3709.

(2)  The first $2.5 million of any remaining revenue shall be deposited into the PILOT special fund established by 32 V.S.A. § 3709.

(3)  Any then‑remaining revenue shall be deposited 50 percent into the PILOT special fund established by 32 V.S.A. § 3709; and 50 percent shall go to the agency of transportation for state aid to town highways, which amount shall be in addition to the appropriations required by 19 V.S.A. § 306, and which shall be distributed to towns in accordance with 19 V.S.A. § 306(a).

Sec. 28.  EFFECTIVE DATE

Sec. 27 of this act (local option tax authority expanded to all towns) shall take effect upon passage, except the amendments to 24 V.S.A. § 138(d) shall apply to local option revenue payments beginning with the first quarterly payment in calendar year 2008.

Ninth:  By adding ten new sections to be numbered Secs. 29 through 38 to read as follows:

Sec. 29.  24 V.S.A. § 1891 is amended to read:

§ 1891.  DEFINITIONS

When used in this subchapter:

* * *

(6)  “Related costs” means expenses, exclusive of the actual cost of constructing and financing improvements, as defined in subdivision 1751(3) of this title, that are directly related to creation of the tax increment financing district and reimbursement of sums previously advanced by the municipality for those purposes, and attaining necessary to attain the purposes and goals for which the tax increment financing district was created, as approved by the Vermont economic progress council.  As used in this subdivision, related costs are “improvements” as defined in subdivision 1751(3) of this title.

(7)  “Financing” means any type of indebtedness incurred or financial vehicles used by a municipality to pay for improvements in a tax increment financing district.

Sec. 30.  24 V.S.A. § 1893 is amended to read:

§ 1893.  PURPOSE

The purpose of tax increment financing districts is to provide revenues for improvements, located wholly or partly within that serve the district and related costs, which will stimulate development or redevelopment within the district, provide for employment opportunities, improve and broaden the tax base, or and enhance the general economic vitality of the municipality, the region, or and the state.


Sec. 31.  24 V.S.A. § 1894 is amended to read:

§ 1894.  POWER AND LIFE OF DISTRICT

(a)  The municipality may incur indebtedness against revenues of the tax increment financing districts for a period of up to 20 years following the creation of the district.  The 20‑year borrowing period of the district shall commence at 12:01 a.m. on April 1 of the year so voted.  Any indebtedness incurred during the borrowing period may be retired over any period authorized by the legislative body of the municipality under section 1898 of this title.  The district shall continue until the date and hour the indebtedness is retired.

(b)  Notwithstanding subsection (a) of this section, any district created to use education tax increment financing  A municipality that has created a tax increment financing district approved under 32 V.S.A. § 5404a(f) may:

(1)  Incur indebtedness for improvements for the district for a period of up to 20 years, provided that the first indebtedness is incurred within five years following approval of the district pursuant to 32 V.S.A. § 5404a(f), and such that the 20 years for incurring indebtedness begins at the time of initial indebtedness.  Prior to requesting municipal approval to secure financing, the municipality shall provide the council with the proposed financing for approval to assure its consistency with the plan approved pursuant to 32 V.S.A. § 5404a(h).  The council shall also assure the viability and reasonableness of any proposed financing other than bonding and least‑cost financing.  A municipality that has not incurred indebtedness within five years following the creation of the district, shall request reapproval from the Vermont economic progress council in order to utilize education tax increment financing following that period.

(2)  The education tax increment may be retained for a 20‑year period,  provided that the 20‑year period commences within five years following approval of the district pursuant to 32 V.S.A. § 5404a(f).  The retention period shall commence at 12:01 a.m. April 1 of the year following the municipality’s notice to the tax department and the Vermont economic progress council.  If a municipality fails to incur debt within the five‑year period but retains the education tax increment, the municipality shall repay the increment in accordance with section 1900 of this title.

Sec. 32.  24 V.S.A. § 1896 is amended to read:

§ 1896.  TAX INCREMENTS

(a)  In each subsequent year, the listers or assessor shall include no more than the original taxable value of such the real property in the assessed valuation upon which the listers or assessor computes the rates of all taxes levied by the municipality, the school district, and every other taxing district in which the tax increment financing district is situated; but the listers or assessor shall extend all rates so determined against the entire assessed valuation of such real property for that year.  In each year for which the assessed valuation exceeds the original taxable value, the municipality treasurer shall hold apart, rather than remit to the taxing districts, that proportion of all taxes paid that year on the real property in the district which such the excess valuation bears to the total assessed valuation.  The amount so held apart each year is referred to in this act as the “tax increment” for that year.  So much of the tax increments received with respect to the district and pledged and appropriated under section 1897 of this title for the payment of debt service on bonds issued for financing for improvements and related costs shall be segregated by the municipality in a special account on its official books and records until all capital indebtedness of the district has been fully paid.  The final payment shall be reported to the lister or assessor, who shall thereafter include the entire assessed valuation of the district in the assessed valuations upon which tax rates are computed and extended and taxes are remitted to all taxing districts.

(b)  Adjustment upon reappraisal.  In the event of a reappraisal of 20 percent or more of all parcels in the municipality, the value of the original taxable property in the district shall be changed by a multiplier, the denominator of which is the municipality’s education property tax grand list for the property within the district in the year prior to the reappraisal or partial reappraisal and the numerator of which shall be the municipality’s reappraised or partially reappraised education property tax grand list for the property within the districtIn such a district, the The state education property tax revenues for the district in the first year following a townwide reappraisal or partial town‑wide reappraisal shall not be less than the dollar amount of the state education property tax revenues  in the prior year.

Sec. 33.  24 V.S.A. § 1897 is amended to read:

§ 1897.  TAX INCREMENT FINANCING

(a)  The legislative body may pledge and appropriate any part or all of the tax increments received from properties contained within the tax increment financing district for the payment of the principal of and interest on bonds issued for financing of improvements contained wholly or partly within the district and for related costs in the same proportion by which the infrastructure or related costs directly serve the district at the time of approval of the project financing by the council, and in the case of infrastructure essential to the development of the district that does not reasonably lend itself to a proportionality formula, the council shall apply a rough proportionality and rational nexus test; provided, that if any tax increment utilization is approved pursuant to 32 V.S.A. § 5404a(g) 32 V.S.A. § 5404a(f), no more than 75 percent of the state property tax increment and no less than 75 percent of the municipal tax increment may be used to service this debt.  Bonds shall only be issued if the legal voters of the municipality, by a majority vote of all voters present and voting on the question at a special or annual municipal meeting duly warned for the purpose, shall give authority to the legislative body to pledge the credit of the municipality for these purposes.  Except as otherwise provided by the municipal charter, the legal voters of a municipality, by a single vote, shall authorize the legislative body to pledge the credit of the municipality up to a specified maximum dollar amount for all debt obligations to be financed with state property tax increment pursuant to approval by the Vermont economic progress council and subject to the provisions of this section and 32 V.S.A. § 5404a.

(b)  A municipality’s pledge of credit for the purpose of issuing a bond financing improvements under this subchapter and 32 V.S.A. § 5404a shall include notice that if the tax increment received by the municipality from any property tax source is insufficient to pay the principal and interest on the debt in any year, for whatever reason, including a decrease in property value or repeal of a state property tax source, unless determined otherwise at the time of such repeal, the municipality shall remain liable for full payment of the bond principal and interest for the term of indebtedness. 

Sec. 34.  24 V.S.A. § 1898(e) is amended to read:

(e)  Prior to the resolution or ordinance of the local governing body authorizing the bonds issued financing under this section, the legislative body of the municipality shall hold one or more public hearings, after public notice, on a financial plan for the proposed improvements and related costs to be funded, including a statement of costs and sources of revenue, the estimates of assessed values within the district, the portion of those assessed values to be applied to the proposed improvements, the resulting tax increments in each year of the financial plan, the amount of bonded indebtedness or other financing to be incurred, other sources of financing and anticipated revenues, and the duration of the financial plan.  A municipality that has approved the creation of a district under this chapter may designate a coordinating agency to administer the district to ensure compliance with this chapter and any other statutory or other requirements.


Sec.35.  24 V.S.A. § 1900 is amended to read:

§ 1900.  DISTRIBUTION

In addition to all other provisions of this chapter, with respect to any tax increment financing district, any municipal tax increment received in any tax year that exceeds the amounts pledged for the payment on principal and interest on the bonds issued any financing for improvements and related costs in the district shall be used to prepay financing, placed in escrow for payment of financing, or distributed to the state education fund, the city, town, or village budget in proportion that each budget bears to the combined total of the budgets unless otherwise negotiated by the city, town, or village.  Any state education tax increment received in any tax year that exceeds the amount pledged for the payment on principal and interest on the bonds issued for improvements and related costs in the district shall not be remitted to the municipality but shall be used only for prepayment of principal and interest on the bonds issued, placed in escrow for bond payment, or otherwise used for defeasance of the bonds.

Sec. 36.  32 V.S.A. § 5404a(f), (g), and (h) are amended and (j) and (k) are added to read:

(f)  A municipality that establishes a tax increment financing district under subchapter 5 of chapter 53 of Title 24 shall collect all property taxes on properties contained within the district and apply up to 75 percent of the tax increment as defined in 24 V.S.A. § 1896 to repayment of debt issued to finance financing of the improvements and related costs for up to 20 years pursuant to 24 V.S.A. § 1894, if approved by the Vermont economic progress council pursuant to this section.

(g)  Any allocation approved pursuant to subsection (e) of this section or utilization of tax increment approved under subsection (f) of this section shall be in addition to any other payments to the municipality under chapter 133 of Title 16.  Allocations Except as otherwise provided in this section or chapter 53 of Title 24, allocations and tax increment utilizations approved pursuant to subsections (e) and (f) of this section shall affect the education property tax grand list and the municipal grand list of the municipality under this chapter beginning April 1 of the year following approval and shall remain available to the municipality for the full period authorized and restricted only to the extent that the real property development giving rise to the increased value to the grand list fails to occur within the authorized period.

(h)  Criteria for approval.  To approve utilization of incremental revenues pursuant to subsection (f) of this section, the Vermont economic progress council shall do all the following:

(1)  Review each application to determine that the new real property development would not have occurred or would have occurred in a significantly different and less desirable manner but for the proposed utilization of the incremental tax revenues.  A district created in a designated growth center under 24 V.S.A. § 2793c shall be deemed to have complied with this subdivision.  The review shall take into account:

* * *

(C)  The amount of additional revenue expected to be generated as a result of the proposed development; the percentage of that revenue that shall be paid to the education fund; the percentage that shall be paid to the municipality; and the percentage of the revenue paid to the municipality that shall be used to pay the municipal tax increment bonds financing incurred for development of the tax increment financing district.

(2)  Process requirements.  Determine that each application meets all of the following four requirements:

* * *

(B)  The municipality has developed a tax increment financing district plan, including: a project description; a development financing plan; a pro forma projection of expected costs and a list of previously advanced related costs to be reimbursed; a projection of revenues; a statement and demonstration that the project would not proceed without the allocation of a tax increment; a projection of types and amount of expected financing; evidence that the municipality is actively seeking or has obtained other sources of funding and investment; and a development schedule that includes a list, a cost estimate, and a schedule for public improvements and projected private development to occur as a result of the improvements.

* * *

(4)  Project criteria.  Determine that the proposed development within a tax incentive increment financing district will accomplish at least three of the following five criteria:

* * *

(C)  The project will affect the mitigation remediation and redevelopment of a brownfield located within the district.  For the purposes of this section, “brownfield” means an area in which a hazardous substance, pollutant, or contaminant is or may be present, and that situation is likely to complicate the expansion, development, redevelopment, or reuse of the property.

* * *

(j)  A municipality with an active tax increment financing district shall:

(1)  Provide VEPC and the tax department with all information required for VEPC and the tax department to issue the report required by subsection (i) of this section on or before December 1 each year.

(2)  Report actual investment, financing activity, escrow status, and “related costs” accounting to VEPC according to the current law municipal audit cycle in 24 V.S.A. § 1681.

(k)  The state auditor of accounts shall review and audit all active tax increment financing districts every three years.

Sec. 37.  Sec. 2i of No. 184 of the Acts of the 2005 Adj. Sess. (2006) is amended to read:

Sec. 2i.  TAX INCREMENT FINANCING DISTRICTS; CAP

Notwithstanding any other provision of law, the Vermont economic progress council may not approve the use of education tax increment financing for more than ten tax increment financing districts and no more than one newly created tax increment financing district in any municipality within the period of five state fiscal years beginning July 1, 2006 2007.  Thereafter no tax increment financing districts may be approved without further authorization by the General Assembly general assembly.

Sec. 38.  EFFECTIVE DATES

Secs. 29 through 37 of this act (tax increment financing amendments) shall take effect on July 1, 2007, except 24 V.S.A. § 1896(b) which shall be retroactively effective to July 1, 2006.

Tenth:  In Sec. 9, after the words “This act shall take effect upon passage except” by inserting the following: as provided in Secs. 22, 28, and 38 and subdivisions  (1) and (2) of this section

And that the bill ought to pass in concurrence with such proposals of amendment.

Thereupon, the bill was read the second time by title only pursuant to Rule 43, the proposals of amendment were collectively agreed to, and pending the question, Shall the bill be read the third time?, Senator Mullin moved to amend the Senate proposal of amendment as follows:

First: In the Second proposal of amendment by adding new Secs. 11a and 11b to read as follows:


Sec. 11a. PAYMENT OF 2007 PROPERTY TAX ADJUSTMENT CLAIMS

     Notwithstanding any other provision of law, a property tax adjustment amount due under Chapter 154 of Title 32 for a claim filed in 2007 shall not be paid or credited to a municipality for adjustment to the property tax bill, but shall be paid to the claimant by the commissioner within 45 days after the claim is filed but no earlier than July 1, 2007.

Sec. 11b.  32 V.S.A. § 6066a(g) is added to read:

(g)  A claimant may elect to receive the property tax adjustment amount as an income tax refund, in lieu of a credit against the homestead property tax liability.  Payments to claimants electing under this subdivision shall be made by the commissioner within 45 days after the claim is filed but no earlier than July 1 following the date the claim is filed.

Second: In the Ninth proposal of amendment, in Sec. 38 [Effective Dates] at the beginning of the section, by inserting the following: (a); and by adding a new subsection (b) to read as follows:

(b) Sec. 11b of this act (optional cash payment of property tax adjustment amount) shall apply to claims filed in 2008 and after.

Thereupon, pending the question, Shall the Senate proposal of amend be amended as recommended by Senator Mullin?, Senator Mullin requested that the question be divided.

Thereupon, the question, Shall the Senate proposal of amendment be amended as recommended in the first proposal of amendment, Sec. 11a?

Which was disagreed to on a roll call, Yeas 5, Nays 24.

Senator Mullin having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Coppenrath, Illuzzi, Maynard, Mullin, Sears.

Those Senators who voted in the negative were: Ayer, Campbell, Carris, Collins, Condos, Cummings, Doyle, Flanagan, Giard, Hartwell, Kitchel, Kittell, Lyons, MacDonald, Mazza, McCormack, Miller, Nitka, Racine, Scott, Shumlin, Snelling, Starr, White.

The Senator absent and not voting was: Bartlett.

Thereupon, Senator Mullin requested and was granted leave to withdraw Sec. 11b and the second proposal of amendment.

Thereupon, third reading of the bill was ordered.

Thereupon, on motion of Senator Shumlin, the rules were suspended and the bill was placed on all remaining stages of its passage in concurrence with proposals of amendment forthwith.

     Thereupon, the bill was read the third time and passed in concurrence with proposals of amendment.

Rules Suspended; Bills Messaged

On motion of Senator Shumlin, the rules were suspended, and the following bills were ordered messaged to the House forthwith:

H. 521; H. 537.

Recess

On motion of Senator Shumlin the Senate recessed until 3:30 P.M.

Called to Order

At 3:40 P.M. the Senate was called to order by the President.

Message from the House No. 67

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:

Mr. President:

     I am directed to inform the Senate the House has passed bills of the following titles:

     H. 330.  An act relating to repeal of the law relating to municipal trailer park ordinances.

     H. 542.  An act relating to approval of amendment to the charter of the City of Vergennes.

In the passage of which the concurrence of the Senate is requested.

The House has considered Senate bills of the following titles:

S. 52.  An act relating to motor vehicles, snowmobiles, motorboats, and all-terrain vehicles.

S. 128.  An act relating to eliminating certain sunsets on forensic examinations at designated hospitals.

And has passed the same in concurrence.

The House has considered Senate bills of the following titles:

S. 6.  An act relating to preventing conviction of innocent persons.

S. 137.  An act relating to reducing the amount of phosphorous allowed in household cleansing products used in dishwashers.

And has passed the same in concurrence with proposals of amendment in the adoption of which the concurrence of the Senate is requested.

Proposal of Amendment; Point or Order; Third Reading Ordered

H. 520.

Senator Lyons, for the Committee on Natural Resources and Energy, to which was referred House bill entitled:

An act relating to the conservation of energy and increasing the generation of electricity within the state by use of renewable resources.

     Reported recommending that the Senate propose to the House to amend the bill by striking out all after the enacting clause and inserting in lieu thereof the following:

* * * Renewable Energy Goal * * *

Sec. 1.  10 V.S.A. § 579 is added to read:

§ 579.  25 BY 25 STATE GOAL

(a)  It is a goal of the state, by the year 2025, to produce 25 percent of the energy consumed within the state through the use of renewable energy sources, particularly from Vermont’s farms and forests.

(b)  By no later than January 15, 2008, the commissioner of public service, in consultation with the secretary of agriculture, food and markets and the commissioner of forests, parks and recreation, shall present to the committees on agriculture and natural resources and energy of the general assembly a plan for attaining this goal.  Plan updates shall be presented no less frequently than every three years, thereafter, and a progress report shall be due annually on January 15.

(c)  By no later than January 15, 2008, the department of public service shall present to the legislative committees on natural resources and energy an updated comprehensive energy plan which shall give due consideration to the public engagement process required under 30 V.S.A. § 254 and under Sec. 2 of No. 208 of the Acts of the 2005 Adj. Sess. (2006).  By that time, the department of public service shall incorporate plans adopted under this section into the state comprehensive energy plan adopted under 30 V.S.A. § 202b.


* * * Act 250 Definition of Farming * * *

Sec. 2.  10 V.S.A. § 6001(22) is amended to read:

(22)  “Farming” means:

(A)  the cultivation or other use of land for growing food, fiber, Christmas trees, maple sap, or horticultural and orchard crops; or

(B)  the raising, feeding, or management of livestock, poultry, fish, or bees; or

(C)  the operation of greenhouses; or

(D)  the production of maple syrup; or

(E)  the on‑site storage, preparation and sale of agricultural products principally produced on the farm; or

(F)  the on‑site production and sale of fuel or power from agricultural products or wastes principally produced on the farm; or

(G)  the raising, feeding, or management of four or more equines owned or boarded by the farmer, including training, showing, and providing instruction and lessons in riding, training, and the management of equines.

* * * Agriculture Development Funds * * *

Sec. 3.  6 V.S.A. § 4710(g)(3) is amended to read:

(3)  Assistance from the agricultural economic development special account shall be available for:

(A)  Business and technical assistance for research and planning to aid a farmer or a group of farmers in developing business enterprises that harvest biomass, convert biomass to energy, or produce biofuel;

(B)  Implementation Cost‑effective implementation assistance to leverage other sources of capital to assist a farmer or group of farmers in purchasing equipment, technology, or other assistance to produce agricultural energy, harvest biomass, or convert biomass into energy, or enable installation and usage of wind, solar, or other technology that relies on a resource that is being consumed at a harvest rate at or below its natural regeneration rate pursuant to 30 V.S.A. § 8002(2); and

* * *


* * * Commercial Building Energy Standards * * *

Sec. 4.  21 V.S.A. § 268 is amended to read:

§ 268.  COMMERCIAL BUILDING ENERGY STANDARDS

(a)  Definitions.  For purposes of this subchapter, “commercial buildings” means all buildings that are not residential buildings as defined in subdivision 266(a)(2) of this title or farm structures as defined in 24 V.S.A. § 4413.

(1)  The following commercial buildings, or portions of those buildings, separated from the remainder of the building by thermal envelope assemblies complying with this section shall be exempt from the building thermal envelope provisions of the standards:

(A)  Those that do not contain conditioned space.

(B)  Those with a peak design rate of energy usage less than an amount specified in the commercial building energy standards (CBES) adopted under subsection (b) of this section.

(2)  These standards shall not apply to equipment or portions of building energy systems that use energy primarily to provide for industrial, or manufacturing, or commercial processes.

(b)  Adoption of commercial building energy standards.  Commercial building construction with respect to which no state or any local building permit application or application for construction plan approval by the commissioner of public safety pursuant to 20 V.S.A. chapter 173 has been submitted on or after January 1, 2007 shall be designed and constructed in substantial compliance with the standards contained in the 2005 Vermont Guidelines for Energy Efficient Commercial Construction, as those standards may be amended by administrative rule adopted by the commissioner of public service.

(c)  Revision and interpretation of energy standards.  On or about January 1, 2009, and at least every three years thereafter, the commissioner of public service shall amend and update the CBES by means of administrative rules adopted in accordance with 3 V.S.A. chapter 25.  At least a year prior to final adoption of each required revision of the CBES, the department of public service shall convene an advisory committee to include one or more mortgage lenders,; builders,; building designers,; architects; civil, mechanical, and electrical engineers; utility representatives,; and other persons with experience and expertise, such as consumer advocates and energy conservation experts.  The advisory committee may provide the commissioner of public service with additional recommendations for revision of the CBES.

(1)  Any amendments to the CBES shall be:

(A)  Consistent with duly adopted state energy policy, as specified in 30 V.S.A. § 202a.

(B)  Evaluated relative to their technical applicability and reliability.

(2)  Each time the CBES are amended by the commissioner of public service, the amended CBES shall become effective upon a date specified in the adopted rule, a date that shall not be less than three months after the date of adoption.  Persons submitting an application for any state or local permit authorizing commercial construction, or an application for construction plan approval by the commissioner of public safety pursuant to 20 V.S.A. chapter 173, before the effective date of the amended CBES shall have the option of complying with the applicable provisions of the earlier or the amended CBES.  After the effective date of the original or the amended CBES, any person submitting such an application for any state or local permit authorizing commercial construction in an area subject to the CBES shall comply with the most recent version of the CBES.

(3)  The advisory committee convened under this subsection, in preparing for the CBES updates, shall advise the department of public service with respect to the coordination of the CBES amendments with existing and proposed demand‑side management programs offered in the state.

(4)  The commissioner of public service is authorized to adopt rules interpreting and implementing the CBES.

(5)  The commissioner of public service may grant written variances or exemptions from the CBES or rules adopted under this section where strict compliance would entail practical difficulty or unnecessary hardship, or is otherwise found unwarranted, provided that:

(A)  Any such variance or exemption shall be consistent with state energy policy, as specified in 30 V.S.A. § 202a.

(B)  Any petitioner for such a variance or exemption can demonstrate that the methods, means, or practices proposed to be taken in lieu of compliance with the rule or rules provide, in the opinion of the commissioner, equal energy efficiency to that attained by compliance with the rule or rules.

(C)  A copy of any such variance or exemption shall be recorded by the petitioner in the land records of the city or town in which the building is located.

(D)  A record of each variance or exemption shall be maintained by the commissioner, together with the certifications received by the commissioner.

(d)  Certification requirement.  Commercial

(1)  The design of commercial buildings shall be certified by the primary designer as compliant with CBES in accordance with this subsection.  A except as compliance is excused by a variance or exemption issued under subdivision (c)(5) of this section.  If applicable law requires that the primary designer be a licensed professional engineer, licensed architect, or other licensed professional, a member of a pertinent licensed profession shall issue this certification.  Otherwise, a certification may be issued by a builder, a licensed professional engineer, or a licensed architect.  If certification is not issued by a licensed professional engineer or a licensed architect, it shall be issued by the builder.  Any certification shall be accompanied by an affidavit and shall certify that the designer acted in accordance with the designer’s professional duty of care in designing the building, and that the commercial construction meets building was designed in substantial compliance with the requirements of the CBES.  The department of public service will develop and make available to the public a certificate that lists key features requirements of the CBES, sets forth certifying language in accordance with this subdivision and requires disclosure of persons relied upon by the primary designer who have contracted to indemnify the primary designer for damages arising out of that reliance.  Any person certifying under this subdivision shall use this certificate or one substantially like it to certify compliance with CBES satisfy these certification obligations.  Certification shall be issued by completing and signing a certificate and permanently affixing it to the outside of the heating or cooling equipment, to the electrical service panel located inside the building, or in a visible location in the vicinity of one of these three areas.  The certificate shall certify that the building has been constructed in compliance with the requirements of the CBES.  The person certifying under this subsection shall provide a copy of each certificate to the department of public service and shall assure that a certificate is recorded and indexed in the town land records.  A builder may contract with a licensed professional engineer or a licensed architect to issue certification and to indemnify the builder from any liability to the owner of the commercial construction caused by noncompliance with the CBES.  In certifying under this subsection, the certifying person may reasonably rely on one or more supporting affidavits received from other persons that contributed to the design affirming that the portions of the design produced by them were properly certifiable under this subsection.  The certifying person may contract for indemnification from those on which the person relies pursuant to this subdivision (1) against damages arising out of that reliance.  This indemnification shall not limit any rights of action of an aggrieved party.

(2)  The construction of a commercial building shall be certified as compliant with CBES in accordance with this subsection, except as compliance is excused by a variance or exemption issued under subdivision (c)(5) of this section.  This certification shall be issued by the general contractor, construction manager, or other party having primary responsibility for coordinating the construction of the subject building, or in the absence of such a person, by the owner of the building.  Any certification shall be accompanied by an affidavit and shall certify that the subject commercial building was constructed in accordance with the ordinary standard of care applicable to the participating construction trades, and that the subject commercial building was constructed substantially in accordance with the construction documents including the plans and specifications certified under subdivision (1) of this subsection for that building.  The department of public service will develop and make available to the public a certificate that sets forth certifying language in accordance with this subdivision, and that requires disclosure of persons who have been relied upon by the person with primary responsibility for coordinating the construction of the building and who have contracted to indemnify that person for damages arising out of that reliance.  The person certifying under this subdivision shall use that certificate or one substantially like it to satisfy these certification obligations.  Certification shall be issued by completing and signing a certificate and permanently affixing it to the outside of the heating or cooling equipment, to the electrical service panel located inside the building, or in a visible location in the vicinity of one of these three areas.  In certifying under this subdivision, the certifying person may reasonably rely on one or more supporting affidavits received from subcontractors or others engaged in the construction of the subject commercial building affirming that the portions of the building constructed by them were properly certifiable under this subdivision.  The certifying person may contract for indemnification from those on which the person relies pursuant to this subdivision (2) against damages arising out of that reliance. This indemnification shall not limit any rights of action of an aggrieved party.

(3)  Any person certifying under this subsection shall provide a copy of the person’s certificate and any accompanying affidavit to the department of public service.

(4)  A certificate issued pursuant to subdivision (1) of this subsection and a certificate issued pursuant to subdivision (2) of this subsection shall be conditions precedent to issuance by the commissioner of public safety (or a municipal official acting under 20 V.S.A. § 2736) of any final occupancy permit required by the rules of the commissioner of public safety for use or occupancy of a commercial building that is also a public building as defined in 20 V.S.A. § 2730(a).

(e)  Action Private right of action for damages against a certifier.

(1)  Except as otherwise provided in this subsection, a person aggrieved by noncompliance with this section another person’s breach of that other person’s representations contained in a certification or supporting affidavit issued or received as provided under subsection (d) of this section, within ten years after the earlier of completion of construction or occupancy of the affected commercial building or portion of that building, may bring a civil action in superior court against a person who has the an obligation of certifying compliance under subsection (d) of this section alleging breach of the representations contained in that person’s certification.  This action may seek injunctive relief, damages arising from the aggrieved party’s reliance on the accuracy of those representations, court costs, and reasonable attorneys’ fees in an amount to be determined by the court.  As used in this subdivision, “damages” means:

(A)  includes costs incidental to increased energy consumption; and

(B)  labor, materials, and other expenses associated with bringing the structure into compliance with CBES in effect on the date construction was commenced.

(2)  A person’s failure to affix the certification as required by this section shall not be an affirmative defense in such an action against the person.

(3)  The rights and remedies created by this section shall not be construed to limit any rights and remedies otherwise provided by law.

(4)  The right of action established in this subsection may not be waived by contract or other agreement.

(5)  It shall be a defense to an action under this subsection that either at the time of completion or at any time thereafter, the commercial building or portion of building covered by a certificate under subsection (d) of this section, as actually constructed, met or exceeded the overall performance standards established in the CBES in effect on the date construction was commenced.

(f)  Violation of section State or local enforcements.  Any person who falsely certifies knowingly makes a false certification under subsection (d) of this section, or any builder party who fails to certify under subsection (d) of this section when required to do so, shall be subject to a civil penalty of not more than $250.00 per day, up to $10,000.00 for each year the violation continuesEach violation shall constitute a separate offense, and each day that the violation continues shall constitute a separate offense.

(g)  Title validity not affected.  A defect in marketable title shall not be created by a failure to record a variance or exemption pursuant to subdivision (c)(5) of this section, by a failure to issue certification or a certificate, as required under subsection (d) of this section, or by a failure under that subsection to:  affix a certificate; or provide a copy of a certificate to the department of public service; or record and index a certificate in the town records.

* * * Smart Metering * * *

Sec. 5.  SMART METERING INVESTIGATION

(a)  The public service board shall investigate opportunities for Vermont electric utilities cost‑effectively to install advanced “smart” metering equipment capable of sending two‑way signals and sufficient to support advanced time‑of‑use pricing during periods of critical peaks or hourly differentiated time‑of‑use pricing. 

(b)  The scope of the investigation shall include the following:

(1)  The current status of implementing either advanced time‑of‑use rate designs or advanced metering by Vermont utilities.

(2)  Analysis of experience from other state jurisdictions and individual utility experience in planning and implementing programs that promote advanced time‑of‑use rate designs or advanced metering.

(3)  Opportunities for exploring ways to design pilot programs and share experience among Vermont utilities with the deployment of advanced meters and rate designs.

(4)  Analysis of all costs and benefits of installing advanced metering equipment, giving due consideration to the circumstances that differentiate Vermont utilities.

(5)  Analysis of opportunities for reducing rates in the short and long term or mitigating rate impacts of investments in advanced metering and ancillary equipment through advanced time‑of‑use rate designs enabled by these investments.

(6)  Analysis of constraints or barriers to implementing this subsection, or opportunities presented by further deferring plans or commitments toward advanced metering equipment or rates.

(7)  Analysis of all supporting and ancillary equipment, equipment standards, and efficiency programs necessary to ensure that customers are adequately and effectively empowered to use and respond cost‑effectively to price signals made possible through advanced metering equipment.

(c)  After investigation, in utility territories where the board concludes it appropriate and cost‑effective, the board shall require each Vermont utility to file plans for investment and deployment of appropriate technologies and plans and strategies for implementing advanced pricing with a goal of ensuring that all ratepayer classes have an opportunity to receive and participate effectively in advanced time‑of‑use pricing plans.

(d)  By January 15, 2008, the public service board shall report to the senate and house committees on natural resources and energy with regard to interim progress in its investigation and measures already implemented under this section.

(e)  By June 15, 2008, the board shall issue a final report and plan for implementation. 

* * * Conservation Rates * * *

Sec. 6.  30 V.S.A. § 218(b) is amended to read:

(b)  The department of public service shall propose, and the board through the establishment of rates of return, rates, tolls, charges, or schedules shall encourage the implementation by electric and gas utilities of energy‑efficiency and load management measures which will be cost‑effective for the utilities and their customers on a life cycle cost basis.  The board shall approve rate designs to encourage the efficient use of natural gas and electricity, including consideration of the creation of an inclining block rate structure for residential rate customers with an initial block of low‑cost power available to all residences. 

(1)  To implement the requirements of this subsection, the public service board shall host one or more workshops to examine the following:

(A)  the parameters for residential inclining block rate designs;

(B)  alternative rate designs, such as critical peak pricing programs or more widespread use of time‑of‑day rates, that would encourage more efficient use of electricity;

(C)  the possible inclusion of exemptions from otherwise applicable inclining block rates or rate designs to encourage efficiency for situations in which special health needs or another extraordinary situation presents such a significant demand for electricity that the board determines use of those rates would cause undue financial hardship for the customer;

(2)  By June 15, 2008, the board shall issue a report and plan for implementation based upon the results of its investigation.  The plan shall require each retail company to upgrade its rates as necessary to implement  new rate designs appropriate to encourage efficient energy use, which shall include residential inclining block rates, if the board determines that those rates would be appropriate, by a specified date, or as part of its next rate‑related appearance before the board, or according to a timetable otherwise specified by the board.  In implementing these rate designs, the board shall consider the appropriateness of phasing in the rate design changes to allow large users of energy a reasonable opportunity to employ methods of conservation and energy efficiency in advance of the full effect of the changes.

* * * Net Metering * * *

Sec. 7.  30 V.S.A. § 219a is amended to read:

§ 219a.  SELF‑GENERATION AND NET METERING

(a)  As used in this section:

(1)  “Customer” means a retail electric consumer who uses a net metering system.

(2)  “Net metering” means measuring the difference between the electricity supplied to a customer and the electricity fed back by a net metering system during the customer’s billing period:

(A)  using a single, nondemand meter or such other meter that would otherwise be applicable to the customer’s usage but for the use of net metering; or

(B)  on farm or group systems, using multiple meters as specified in this chapter.  The calculation will be made by converting all meters to a nondemand, nontime‑of‑day meter, and equalizing them to the tariffed kilowatt‑hour rate.

* * *

(4)  “Farm system” means a facility of no more than 150 250 kilowatts (AC) output capacity, except as provided in subdivision (k)(5) of this section, that generates electric energy on a farm operated by a person principally engaged in the business of farming, as that term is defined in Regulation 1.175‑3 of the Internal Revenue Code of 1986, from the anaerobic digestion of agricultural products, byproducts, or wastes, or other renewable sources as defined in subdivision (3)(E) of this subsection, intended to offset the meters designated under subdivision (g)(1)(A) of this section on the farm or has entered into a contract as specified in subsection (k) of this section.

(b)  A customer shall pay the same rates, fees, or other payments and be subject to the same conditions and requirements as all other purchasers from the electric company in the same rate‑class, except as provided for in this section, and except for appropriate and necessary conditions approved by the board for the safety and reliability of the electric distribution system.

* * *

(f)  Consistent with the other provisions of this title, electric energy measurement for net metering farm or group net metering systems shall be calculated in the following manner:

(1)  Net metering customers that are farm or group net metering systems may credit on‑site generation against all meters designated to the farm system or group net metering system under subdivision (g)(1)(A) of this section.

(2)  Electric energy measurement for farm or group net metering systems shall be calculated by subtracting total usage of all meters included in the farm or group net metering system from total generation by the farm or group net metering system.  If the electricity generated by the farm or group net metering system is less than the total usage of all meters included in the farm or group net metering system during the billing period, the farm or group net metering system shall be credited for any accumulated kilowatt‑hour credit and then billed for the net electricity supplied by the electric company, in accordance with the procedures in subsection (g) of this section.

(3)  If electricity generated by the farm or group net metering system exceeds the electricity supplied by the electric company:

(A)  The farm or group net metering system shall be billed for the appropriate charges for each meter for that month, in accordance with subsection (b) of this section.

(B)  Excess kilowatt‑hours generated during the billing period shall be added to the accumulated balance with this kilowatt‑hour credit appearing on the bill for the following billing period.

(C)  Any accumulated kilowatt‑hour credits shall be used within 12 months or shall revert to the electric company without any compensation to the farm or group net metering system.  Power reverting to the electric company under this subdivision (3) shall be considered SPEED resources under section 8005 of this title.

(g)(1)  In addition to any other requirements of section 248 of this title and this section and board rules thereunder, before a net metering farm or group net metering system including more than one meter may be formed and served by an electric company, the proposed net metering farm or group net metering system shall file with the board, with copies to the department and the serving electric company, the following information:

(A)  the meters to be included in the farm or group net metering system, which shall be associated with the farm buildings and residences owned or occupied by the person operating the farm or group net metering system, or the person’s family or farm employees, or other members of the group, identified by account number and location;

(B)  a method for adding and removing meters included in the farm or group net metering system;

(C)  a designated person responsible for all communications from the farm or group net metering system to the serving electric company, for receiving and paying bills for any service provided by the serving electric company for the farm or group net metering system, and for receiving any other communications regarding the farm or group net metering system net metering; and

(D)  a binding process for the resolution of any disputes within the farm or group net metering system relating to net metering that does not rely on the serving electric company, the board, or the department.

(2)  The farm or group net metering system shall, at all times, maintain a written designation to the serving electric company of a person who shall be the sole person authorized to receive and pay bills for any service provided by the serving electric company, and for receiving to receive any other communications regarding the farm system, the group net metering system, or net metering.

(3)  The serving utility shall implement appropriate changes to the farm system or group net metering system within 30 days after receiving written notification from the designated person.  However, written notification of a change in the person designated under subdivision (2) of this subsection shall be effective upon receipt by the serving utility.  The serving utility shall not be liable for action based on such notification, but shall make any necessary corrections and bill adjustments to implement revised notifications.

(4)  Pursuant to subsection 231(a) of this title, after such notice and opportunity for hearing as the board may require, the board may revoke a certificate of public good issued to a farm or group net metering system.

(5)  A group net metering system may consist only of customers that are located within the service area of the same electric company.  Various buildings owned by a municipality may constitute a group net metering system.  If it determines that it would promote the general good, the board shall permit a noncontiguous group of net metering customers to comprise a group net metering system.

(h)(1)  An electric company:

(A)  Shall make net metering available to any customer using a net metering system, group net metering system, or farm system on a first‑come, first‑served basis until the cumulative output capacity of net metering systems equals 1.0 2.0 percent of the distribution company’s peak demand during 1996; or the peak demand during the most recent full calendar year, whichever is greater.  The board may raise the 1.0 2.0 percent cap.  In determining whether to raise the cap, the board shall consider the following:

(i)  the costs and benefits of net metering systems already connected to the system; and

(ii)  the potential costs and benefits of exceeding the cap, including potential short and long‑term impacts on rates, distribution system costs and benefits, reliability and diversification costs and benefits;

(B)  Shall allow net metering systems to be interconnected using a kilowatt‑hour meter capable of registering the flow of electricity in two directions or such other comparably equipped meter that would otherwise be applicable to the customer’s usage but for the use of net metering;

(C)  May, at its own expense, and with the written consent of the customer, install one or more additional meters to monitor the flow of electricity in each direction;

(D)  Shall Except as otherwise provided in this section, shall charge the customer a minimum monthly fee that is the same as for other customers of the electric distribution company in the same rate class, but shall not charge the customer any additional standby, capacity, interconnection, or other fee or charge;

(E)  May require a customer to comply with generation interconnection, safety, and reliability requirements, as determined by the public service board by rule or order, and may charge reasonable fees for interconnection, establishment, special metering, meter reading, accounting, account correcting, and account maintenance of net metering arrangements of greater than 15 kilowatt (AC) capacity;

(F)  May charge, if the capacity of the distribution system is insufficient for the designed generation, subject to determination by the board, a reasonable fee to cover the cost of electric company improvements necessary to distribute power;

(G)  May require that all meters included within a farm or group net metering system be read on the same billing cycle;

(H)  May book and defer, with carrying costs, additional incremental costs, to the extent that such costs are not recovered through charges, authorized in subdivisions (D), (E), and (F) of this subdivision (1), directly related to implementing net metering of greater than 15 kilowatt (AC) capacity;

(I)  Shall receive from a farm system, which is designed to produce less energy than the total annual load of the meters identified in subdivision (g)(1)(A) of this section, any tradeable renewable credits for which the farm  system is eligible.  All other farm systems shall retain any tradeable renewable credits for which the farm is eligible;.

(2)  All such requirements shall be pursuant to and governed by a tariff approved by the board and any applicable board rule, which tariffs and rules shall be designed in a manner reasonably likely to facilitate net metering.

* * *

(j)  Notwithstanding the provisions of this section that define a net metering system as being of no more than 15 kilowatts (AC) capacity, the board may allow net metering for up to ten 15 systems per year for customers that produce more than 15 kilowatts (AC) capacity, but do not produce more than 150 250 kilowatts of power and are not farm systems.

(k)  Notwithstanding the provisions of subsections (f) and (g) of this section, an electric company may contract to purchase all or a portion of the output products from a farm or group net metering system, provided:

(1)  the farm or group net metering system obtains a certificate of public good under the terms of subsections (c) and (d) of this section;

(2)  any contracted power shall be subject to the limitations set forth in subdivision (h)(1) of this section;

(3)  any contract shall be subject to interconnection and metering requirements in subdivisions (h)(1)(C) and (i)(2) and (3) of this section;

(4)  any contract may permit all or a portion of the tradeable renewable energy credits for which the farm or group net metering system is eligible to be transferred to the electric company;

(5)  the output capacity of a system may exceed 150 250 kilowatts, provided:

(A)  the contract assigns the amount of power to be net metered;

(B)  the net metered amount does not exceed 150 250 kilowatts; and

(C)  only the amount assigned to net metering is assessed to the cap provided in subdivision (h)(1)(A) of this section.


* * * Temporary Meteorological Stations * * *

Sec. 8.  30 V.S.A. § 246 is added to read:

§ 246.  TEMPORARY SITING OF METEOROLOGICAL STATIONS

(a)  For purposes of this section, a “meteorological station” consists of one temporary tower, which may include guy wires, and attached instrumentation to collect and record wind speed, wind direction, and atmospheric conditions.

(b)  The public service board shall establish by rule or order standards and procedures governing application for, and issuance or revocation of, a certificate of public good for the temporary installation of one or more meteorological stations under the provisions of section 248 of this title.  A meteorological station shall be deemed to promote the public good of the state if it is in compliance with the criteria of this section and the board rules or orders.  An applicant for a certificate of public good for a meteorological station shall be exempt from the requirements of subsection 202(f) of this title.

(c)  In developing rules or orders, the board:

(1)  Shall develop a simple application form and shall require that completed applications be filed with the board, the department of public service, the agency of natural resources, and the municipality in which the meteorological station is proposed to be located.

(2)  Shall require that if no objections are filed within 30 days of the board’s receipt of a complete application and the board determines that the applicant has met all of the requirements of section 248 of this title, the certificate of public good shall be issued for a period that the board finds reasonable, but in no event for more than five years.  Upon request of an applicant, the board may renew a certificate of public good.  Upon expiration of the certificate, the meteorological station and all associated structures and material shall be removed, and the site shall be restored substantially to its preconstruction condition.

(3)  May waive the requirements of section 248 of this title that are not applicable to meteorological stations, including criteria that are generally applicable to public service companies as defined in this title.  The board shall not waive review regarding whether construction will have an undue adverse effect on esthetics, historic sites, air and water purity, the natural environment, and the public health and safety.

(4)  Shall seek to simplify the application and review process, as appropriate, in conformance with this section.

(d)  A proposal for decision shall be issued within five months of when the board receives a completed application for a certificate of public good for the temporary installation of one or more meteorological stations under the provisions of section 248 of this title.

* * * Renewable Energy Pricing and Portfolio Standards * * *

Sec. 9.  30 V.S.A. § 8002(4) is amended to read:

(4)  “New renewable energy” means renewable energy produced by a generating resource coming into service after December 31, 2004.  This may include the additional energy from an existing renewable facility retrofitted with advanced technologies or otherwise operated, modified, or expanded to increase the kwh output of the facility in excess of an historical baseline established by calculating the average output of that facility for the 10‑year period that ended December 31, 2004.  If the production of new renewable energy through retrofitting expansion involves combustion of the resource, the system also must result in an incrementally higher level of energy conversion efficiency or significantly reduced emissions.  For the purposes of this chapter, renewable energy refers to either “existing renewable energy” or “new renewable energy.”

Sec. 10.  30 V.S.A. § 8003 is amended to read:

§ 8003.  RENEWABLE ENERGY PRICING

(a)  Upon petition of an electric company subject to this title, upon request of the department of public service, or on its own initiative, the public service board may approve one or more renewable pricing programs for one or more electric utilities; provided, however, in the case of a municipal plant or department formed under local charter or chapter 79 of this title, or an electric cooperative formed under chapter 81 of this title, any renewable pricing program approved by the board shall also be approved by a majority of the voters of a municipality or cooperative voting upon the question at a duly warned annual or special meeting held for that purpose.  Unless the board finds good cause to exempt a utility, by no later than July 1, 2008, each electric utility, municipal department formed under local charter or chapter 79 of this title, and each electric cooperative formed under chapter 81 of this title shall implement a renewable energy pricing program under this section for its customers, or shall offer customers the option of making a voluntary contribution to the Vermont clean energy development fund established under 10 V.S.A. § 6523.  Such renewable energy pricing programs may include, but are not limited to, tariffs, standard special contracts, or other arrangements whose purpose is to increase the company’s reliance on, or the customer’s support of, renewable sources of energy or the type and quantity of renewable energy resources available.

* * *

(f)  Renewable pricing programs offered by a company shall be available to such customer classes as the board may determine.

(g)  The board shall consider the following factors in deciding whether and upon what conditions to approve a proposed renewable energy pricing program:

(1)  minimization of marketing and administrative expenses;

(2)  auditing or certification of sources of energy or tradeable renewable energy credits;

(3)  marketing and promotion plans;

(4)  effectiveness of the program in meeting the goals of promoting renewable energy generation and public understanding of renewable energy sources in Vermont;

(5)  retention by the program of renewable energy production incentives, tax incentives and other incentives earned or otherwise obtained by energy resources acquired pursuant to or as part of a renewable energy pricing program approved under this section to reduce the cost of any premiums paid under this section; and

(6)  costs imposed on nonparticipating customers arising on account of the implementation of the voluntary renewable energy pricing program.

Sec. 11.  30 V.S.A. § 8004(e) is amended to read:

(e)  In lieu of, or in addition to purchasing tradeable renewable energy credits to satisfy the portfolio requirements of this section, a retail electricity provider in this state may pay to a renewable energy fund established by the public service board the Vermont clean energy development fund established under 10 V.S.A. § 6523 an amount per kilowatt hour as established by the board.  As an alternative, the board may require any proportion of this amount to be paid to the energy conservation fund established under subsection 209(d) of this title.


* * * SPEED Program * * *

Sec. 12.  30 V.S.A. § 8005 is amended to read:

§ 8005.  SUSTAINABLY PRICED ENERGY ENTERPRISE DEVELOPMENT (SPEED) PROGRAM

* * *

(b)  The SPEED program shall be established, by rule, order, or contract, by the public service board by January 1, 2007.  As part of the SPEED program, the public service board may, and in the case of subdivisions (2) and (3) of this subsection shall:

* * *

(2)  allow the developer of a facility that is one megawatt or less, and is a qualifying SPEED resource or a nonqualifying SPEED resource, to sell that power under a long term contract that is established at a specified margin below the hourly spot market price determined by the board to be adequate to promote SPEED resource development while remaining consistent with the principles of least‑cost energy services under section 218c of this title.  For purposes of this section, a long‑term contract should be 15 years or greater unless the board finds good cause for a shorter term;

(3)  encourage Vermont’s retail electricity providers to secure long‑term  contracts, at stable prices, for renewable energy that are anticipated to be below the long‑term market price, over the lives of the projects qualifying SPEED resources.  The board shall create a standard contract price, or a set of maximum and minimum provisions, or both, for qualifying SPEED resources over 1 MW of capacity.  In setting a standard contract price for a qualifying SPEED resource, the board shall consider the goal of developing qualified SPEED resources, least cost provision of energy service under section 218c, and the impact on electric rates.  The board may create a competitive bid process through which to select a portion of those contracts;

* * *

(d)(1)  The public service board shall meet on or before January 1, 2012, and open a proceeding, and issue findings determining to determine the total amount of qualifying SPEED resources that have come into service or are projected to come into service during the period of time between January 1, 2005 and January 1, 2013 been supplied to Vermont retail electricity providers or have been issued a certificate of public good.  If the board finds that the amount of qualifying SPEED resources coming into service during that time or having been issued a certificate of public good after January 1, 2005 and before July 1, 2012 equals or exceeds total statewide growth in electric energy usage retail sales during the period of time between January 1, 2005 and January 1, 2012 that time, and in addition, at least five percent of the 2005 total statewide electric retail sales is provided by qualified SPEED resources, or if it finds that the amount of qualifying SPEED resources equals or exceeds 10 percent of total statewide electric energy usage retail sales for calendar year 2005, the portfolio standards established under this chapter shall not be in force.  The board shall make its determination by July 1, 2012 January 1, 2013.  If the board finds that the goal established has not been met, one year after the board’s determination the portfolio standards established under subsection 8004(b) of this title shall take effect.

(2)  A state goal is to assure that 20 percent of total statewide electric retail sales before July 1, 2017 shall be generated by speed resources.  The public service board shall report to the house and senate committees on natural resources and energy and to the joint energy committee by December 15, 2012 with regard to the state’s progress in meeting this goal.  In addition, the board shall report to the the house and senate committees on natural resources and energy and to the joint energy committee by December 15, 2014 with regard to the state’s progress in meeting this goal and, if necessary, shall include any appropriate recommendations for measures that will make attaining the goal more likely.

(3)  For the purposes of the determination to be made under this subsection, electricity produced at all facilities owned by or under long-term contract to Vermont retail electricity providers, whether it is generated inside or outside Vermont, that is new renewable energy shall be counted in the calculations under subdivision subdivisions (d)(1) and (2) of this section.

* * *

* * * Assistance * * *

Sec. 13.  REPORTS ON OMBUDSMAN AND TECHNICAL ASSISTANCE FOR COMMUNITIES

Technical assistance.  By no later than January 15, 2008, the public service department, after consultation with the public service board and the clean energy development fund investment committee established under 10 V.S.A. § 6523(e)(1)(B), shall report to the legislative committees on natural resources and energy with a recommended program by which the state may best:

(1)  Establish and fund an office of ombudsman, which would be charged with assisting those who desire to develop renewable energy projects in dealing with the regulatory process.  In developing the proposal, the department shall consult with the agency of natural resources with respect to how to assist individuals seeking a certificate of public good for a mini‑hydroelectric facility and those seeking water quality certification, and shall consider how best to coordinate services with the ombudsman for renewable energy at the agency of agriculture, food and markets.

(2)  Establish and fund a program to provide communities with assistance in assessing their renewable energy resources and the potential for development of those resources, and in evaluating, selecting, and implementing reasonable alternatives for financing the construction of those renewable energy resources.

* * * Biodiesel * * *

Sec. 14.  USE OF BIODIESEL IN STATE OFFICE BUILDINGS, STATE GARAGES, AND THE STATE VEHICLE FLEET

(a)  Definitions.  As used in this section:

(1)  “Biodiesel blend” means a blend of biodiesel fuel and petroleum diesel fuel or petroleum heating fuel that contains at least two percent biodiesel fuel by volume.

(2)  “Biodiesel fuel” means a renewable, biodegradable, mono alkyl ester combustible liquid fuel derived from vegetable oil or animal fat which meets the American Society for Testing and Materials (ASTM) specification D6751‑02 for Biodiesel Fuel (B100) Blend Stock for Distillate Fuel.

(b)  On or before January 15, 2008, the department of buildings and general services, department of public service, and agency of transportation jointly shall submit a report to the house and senate committees on institutions, the house and senate committees on natural resources and energy, the house and senate committees on transportation, the house and senate committees on agriculture, the house committee on commerce, the house committee on ways and means, and the senate committee on finance with recommendations on increasing the use of biodiesel blends in state office buildings, state garages, and in the state transportation fleet. 

(1)  The portion of the report prepared by the department of buildings and general services shall contain:

(A)  A summary of the current use of biodiesel blends in state office buildings.

(B)  Recommendations on how to increase the use of biodiesel blends in all state office buildings, wherever feasible, to at least five percent biodiesel (B5) by December 31, 2008, and to at least 10 percent biodiesel (B10) by 2012.

(C)  A summary of any obstacles to increasing biodiesel use in state buildings.

(D)  A proposed work plan to increase biodiesel use.

(2)  The portion of the report prepared by the department of public service shall contain:

(A)  A summary of the biodiesel fuel production capacity, storage facilities, and distribution facilities currently available in Vermont.

(B)  Recommendations for increasing biodiesel fuel production, storage facilities, and distribution facilities.

(C)  A summary of current information on the performance of biodiesel blends for use as heating fuel and as a motor vehicle fuel.

(D)  A summary of the national and regional quality assurance and quality control measures in use for blending biodiesel fuel.

(E)  A proposed work plan to increase biodiesel use.

(3)  The portion of the report prepared by the agency of transportation shall contain:

(A)  A summary of the current use of biodiesel blends in state garages and the state transportation fleet.

(B)  Recommendations on how to increase the use of biodiesel blends in state garages and in the state transportation fleet, wherever feasible, to at least five percent biodiesel (B5) by December 31, 2008, and to at least 10 percent biodiesel (B10) by 2012.

(C)  A summary of any obstacles to increasing biodiesel use in state garages and the state transportation fleet.

(D)  A proposed work plan to increase biodiesel use.

(c)  The department of public service, with representatives of the department of buildings and general services and the agency of transportation present, shall conduct at least one public hearing to review the draft report and to solicit comments prior to finalizing the report.

* * * Wind‑Powered Electric Generating Facilities * * *

Sec. 15.  32 V.S.A. § 5401(10)(J) is added to read:

(10)  “Nonresidential property” means all property except:

* * *

(J)  Buildings and fixtures subject to the tax on wind-powered electric generating facilities under section 5402c of this title.

Sec. 16.  32 V.S.A. § 5402c is added to read:

§ 5402c.  WIND-POWERED ELECTRIC GENERATING FACILITIES TAX

(a)  A facility certified by the commissioner of public service as a facility which produces electrical energy for resale, generated solely from wind power, which has an installed capacity of at least five megawatts, which was placed in service after January 1, 2007, and which holds a valid certificate of public good issued under 30 V.S.A. § 248, shall be assessed an alternative education property tax on its buildings and fixtures used directly and exclusively in generation of electrical energy from wind power.  The tax shall be imposed at a rate of $0.00001 per kWh of electrical energy produced by the certified facility, as determined by the public service department for the six months ending April 30 and the six months ending October 31 each year, but in no case shall the tax imposed for any six month period be less than an amount equal to 15% of the installed capacity of the facility multiplied by the rate per kWh imposed by this subsection.  Until a facility is certified under this subsection, it shall remain subject to taxation under section 5402 of this title.

(b)  The tax imposed by this section shall be paid to the commissioner of taxes by the person or entity then owning or operating the certified facility, by December 1 for the period ending October 31 and by June 1 for the period ending April 30, for deposit into the education fund.  A person or entity failing to make returns or pay the tax imposed by this section within the time required shall be subject to and governed by the provisions of sections 3202 and 3203 and subchapters 8 and 9 of chapter 151 of this title.

(c)  Buildings and fixtures subject to the education property tax under this section shall not be taken into account in determining the common level of appraisal for the municipality.

Sec. 17.  MUNICIPAL PROPERTY TAXES UNAFFECTED

Application of alternative education property tax to a wind-powered electric generating facility under 32 V.S.A. § 5402c shall have no effect upon the assessment of municipal taxes upon that facility by any municipality in this state.

* * * Business Energy Credit * * *

Sec. 18.  32 V.S.A. § 5822(c)(1)(B) and (d) are amended to read:

(c)  The amount of tax determined under subsection (a) of this section shall be:

(1)  increased by 24 percent of the taxpayer’s federal tax liability for the taxable year for the following:

* * *

(B)  recapture of federal investment tax credit and increased by 76 percent of the Vermont‑property portion of the business energy credit component of the federal investment tax credit recapture for the taxable year; this shall be computed based on the federal investment tax credit as it existed in taxable year 2007;

(d)  A taxpayer shall be entitled to a credit against the tax imposed under this section of 24 percent of each of the credits allowed against the taxpayer’s federal income tax for the taxable year as follows:  elderly and permanently totally disabled credit, investment tax credit, and child care and dependent care credits.  A taxpayer shall also be entitled to a credit against the tax imposed under this section of 76 percent of the Vermont‑property portion of the business energy credit component of the federal investment tax credit allowed against the taxpayer’s federal income tax for the taxable year under Section 48 of the Internal Revenue Code; provided, that this shall be computed based on the federal investment tax credit as it existed in taxable year 2007.

Sec. 19.  32 V.S.A. § 5930z is added to read:

§ 5930z.  Pass‑Through of Federal Energy Credit for Corporations

(a)  A taxpayer of this state shall be eligible for a credit against the tax imposed under section 5832 of this title in an amount equal to the Vermont‑property portion of the business energy credit component of the federal investment tax credit allowed against the taxpayer’s federal income tax for the taxable year under Section 48 of the Internal Revenue Code; provided, that this shall be computed based on the federal investment tax credit as it existed in taxable year 2007. 

(b)  Any taxpayer who has received a credit under subsection (a) of this section in any prior year shall increase its corporate income tax under this chapter by the amount of the Vermont‑property portion of the business energy credit component of the federal investment tax credit recapture for the taxable year; provided, that this shall be computed based on the federal investment tax credit as it existed in taxable year 2007.  

Sec. 20.  EFFECTIVE DATE OF BUSINESS ENERGY TAX CREDITS

Secs. 18 and 19 of this act (business energy tax credits) shall apply to taxable years 2008 and after.

* * * Mini‑Hydro Reports * * *

Sec. 21.  PUBLIC SERVICE BOARD REPORT ON PERMITTING MINI‑HYDROELECTRIC PROJECTS

Prior to December 15, 2007, the public service board shall report to the house committee on fish, wildlife and water resources and the senate committee on natural resources and energy with a recommendation for a simple, predictable, and environmentally sound process, other than the process set forth in subsection 248(j) of Title 30, for issuing a certificate of public good under section 248 of Title 30 for mini‑hydroelectric projects.  The report shall:

(1)  Recommend criteria for determining what constitutes a mini‑hydroelectric facility, including the allowable maximum amount of output capacity at the facility and the type of eligible facilities, natural features, or other sites.

(2)  Address permit application requirements, including ownership of the facility and structural safety of the mini‑hydroelectric project.

(3)  Address additional uses of the mini‑hydroelectric project such as flood control; fish and wildlife habitat; recreation; water supply; historic resource; and structural grade control for infrastructure, roads, bridges, and houses.

(4)  Address the use of flashboards to increase upstream flooding.

(5)  Address measures to prevent fish from entering turbines and penstocks.

(6)  Address the size of authorized diversions and penstocks.

Sec. 22.  AGENCY OF NATURAL RESOURCES REPORT ON WATER QUALITY CERTIFICATION FOR MINI‑HYDROELECTRIC PROJECTS

Prior to December 15, 2007, the secretary of natural resources shall report to the house committee on fish, wildlife and water resources and the senate committee on natural resources and energy with a recommendation for a simple, predictable, and environmentally sound procedure for completing a water quality certification review of mini‑hydroelectric projects as required by Section 401 of the federal Clean Water Act.  The report shall:

(1)  Recommend, after consultation with the public service board, criteria for determining what constitutes a mini‑hydroelectric facility, including the allowable maximum amount of output capacity at the facility and the type of eligible facilities, natural features, or other sites;

(2)  Address bypass flows for mini‑hydroelectric projects.

(3)  Address the need for monitoring of dissolved oxygen at mini‑hydroelectric facilities.

(4)  Address seasonal flows in bypasses at run‑of‑river facilities. 

(5)  Address the need for new fish or flow studies for mini‑hydroelectric projects. 

Sec. 23.  REPORT ON STATUS OF SPEED PROGRAM

By no later than January 15, 2008, the public service board shall report to the legislative committees on natural resources and energy with an evaluation of the likelihood of qualifying SPEED resources coming into service in time to meet the standards established in 30 V.S.A. § 8005(d), as amended by this act.

* * * Plumbing * * *

Sec. 24.  26 V.S.A. § 2173(a) is amended to read:

§ 2173.  RULES ADOPTED BY THE BOARD

(a)  The plumber’s examining board may, pursuant to the provisions of 3 V.S.A. chapter 25 (Administrative Procedure Act), make and revise such plumbing rules as necessary for protection of the public health, except that no rule of the board may require the installation or maintenance in a private residence of a water heater at a minimum temperature.  To the extent that a rule of the board conflicts with this subsection, that rule shall be invalid and unenforceable.  The rules shall be in effect in every city, village, and town having a public water system or public sewerage system and apply to all premises connected to the systems and all public buildings containing plumbing or water treatment and heating specialties whether they are connected to a public water or sewerage system.  The local board of health and the commissioner of public safety shall each have authority to enforce these rules.  The rules shall be limited to minimum performance standards reasonably necessary for the protection of the public against accepted health hazards.  The board may, if it finds it practicable to do so, adopt the provisions of a nationally recognized plumbing code.

Sec. 25.  26 V.S.A. § 2192a(g) is added to read:

(g)  The department of public safety and the plumber’s examining board shall work with representatives from the Vermont solar energy industry to create a solar water heating specialist license and shall allow experienced solar thermal installers who have completed necessary course work to be eligible for the hydronic heating specialty license examination without the requirement of an affidavit from a master plumber.


* * *Affordability * * *

Sec. 26.  30 V.S.A. § 218(e) is added to read:

(e)  Notwithstanding any other provisions of this section, the board may approve a rate schedule, tariff, agreement, contract, or settlement that provides reduced rates for low income electric utility consumers to better assure affordability.  For the purposes of this subsection, “low income electric utility consumer” means a customer who has a household income at or below 150 percent of the current federal poverty level.  When considering whether to approve a rate schedule, tariff, agreement, contract, or settlement for low income electric utility consumers, the board may take into account the potential impact on, and cost-shifting to, other utility customers.

And that the bill ought to pass in concurrence with such proposal of amendment.

Senator Cummings, for the Committee on Finance, to which the bill was referred, reported recommending that the bill be amended by striking out all after the enacting clause and inserting in lieu thereof the following:

Sec. 1.  DESIGNATION OF ACT

This act shall be referred to as “Vermont’s sustainable future: efficiency and energy act.”

Sec. 2.  LEGISLATIVE FINDINGS

The general assembly finds that:

(1)  Global climate change, which is threatening our environment and perhaps ultimately our existence, has been caused in part by an energy policy that is largely dependent on the burning of fossil fuels.

(2)  In order to slow or stop climate change, it is essential that we reduce or eliminate our dependency on fossil fuels by significantly improving energy efficiency and shifting to nonpolluting benign forms of energy such as wind, sun, and water power.

(3)  In order for Vermont to meet the greenhouse gas reduction goals set by the conference of the New England governors and Eastern Canadian premiers’ climate change action plan, Vermont needs to provide effective weatherization services, energy audits, green building practices, and installation of renewable energy systems.

(4)  The “Vermont energy efficiency potential study for non-regulated fuels” recently completed by the department of public service indicates that Vermont has cost-effective potential energy savings of $486 million over the next ten years with 63 percent of those savings from building shell improvements.  In order to meet these savings goals, a ten-fold expansion of capabilities to deliver services to as many as 10,000 buildings a year is essential to meet these savings goals.

(5)  Workforce development in the field of green building, renewable energy, and energy efficiency an essential component of the battle to combat global climate change, has not kept pace with the growth of this industry.  New business are being created, innovated energy systems are being designed and manufactured, but there are few trained applicants to fill the new well-paying jobs being created in this field.

(6)  Next generation report stated that Vermont must implement strategies to expand its skilled workforce and approach the future by integrating economic development, workforce development, and education policies.

* * * Renewable Energy Goal * * *

Sec. 3.  10 V.S.A. § 579 is added to read:

§ 579.  25 BY 25 STATE GOAL

(a)  It is a goal of the state, by the year 2025, to produce 25 percent of the energy consumed within the state through the use of renewable energy sources, particularly from Vermont’s farms and forests.

(b)  By no later than January 15, 2008, the commissioner of public service, in consultation with the secretary of agriculture, food and markets and the commissioner of forests, parks and recreation, shall present to the committees on agriculture and natural resources and energy of the general assembly a plan for attaining this goal.  Plan updates shall be presented no less frequently than every three years, thereafter, and a progress report shall be due annually on January 15.

(c)  By no later than January 15, 2008, the department of public service shall present to the legislative committees on natural resources and energy an updated comprehensive energy plan which shall give due consideration to the public engagement process required under 30 V.S.A. § 254 and under Sec. 2 of No. 208 of the Acts of the 2005 Adj. Sess. (2006).  By that time, the department of public service shall incorporate plans adopted under this section into the state comprehensive energy plan adopted under 30 V.S.A. § 202b.

* * * Act 250 Definition of Farming * * *

Sec. 4.  10 V.S.A. § 6001(22) is amended to read:

(22)  “Farming” means:

(A)  the cultivation or other use of land for growing food, fiber, Christmas trees, maple sap, or horticultural and orchard crops; or

(B)  the raising, feeding, or management of livestock, poultry, fish, or bees; or

(C)  the operation of greenhouses; or

(D)  the production of maple syrup; or

(E)  the on‑site storage, preparation and sale of agricultural products principally produced on the farm; or

(F)  the on‑site production and sale of fuel or power from agricultural products or wastes principally produced on the farm; or

(G)  the raising, feeding, or management of four or more equines owned or boarded by the farmer, including training, showing, and providing instruction and lessons in riding, training, and the management of equines.

* * * Agriculture Development Funds * * *

Sec. 5.  6 V.S.A. § 4710(g)(3) is amended to read:

(3)  Assistance from the agricultural economic development special account shall be available for:

(A)  Business and technical assistance for research and planning to aid a farmer or a group of farmers in developing business enterprises that harvest biomass, convert biomass to energy, or produce biofuel;

(B)  Implementation Cost‑effective implementation assistance to leverage other sources of capital to assist a farmer or group of farmers in purchasing equipment, technology, or other assistance to produce agricultural energy, harvest biomass, or convert biomass into energy, or enable installation and usage of wind, solar, or other technology that relies on a resource that is being consumed at a harvest rate at or below its natural regeneration rate pursuant to 30 V.S.A. § 8002(2); and

* * *

* * * Commercial Building Energy Standards * * *

Sec. 6.  21 V.S.A. § 268 is amended to read:

§ 268.  COMMERCIAL BUILDING ENERGY STANDARDS

(a)  Definitions.  For purposes of this subchapter, “commercial buildings” means all buildings that are not residential buildings as defined in subdivision 266(a)(2) of this title or farm structures as defined in 24 V.S.A. § 4413.

(1)  The following commercial buildings, or portions of those buildings, separated from the remainder of the building by thermal envelope assemblies complying with this section shall be exempt from the building thermal envelope provisions of the standards:

(A)  Those that do not contain conditioned space.

(B)  Those with a peak design rate of energy usage less than an amount specified in the commercial building energy standards (CBES) adopted under subsection (b) of this section.

(2)  These standards shall not apply to equipment or portions of building energy systems that use energy primarily to provide for industrial, or manufacturing, or commercial processes.

(b)  Adoption of commercial building energy standards.  Commercial building construction with respect to which no state or any local building permit application or application for construction plan approval by the commissioner of public safety pursuant to 20 V.S.A. chapter 173 has been submitted on or after January 1, 2007 shall be designed and constructed in substantial compliance with the standards contained in the 2005 Vermont Guidelines for Energy Efficient Commercial Construction, as those standards may be amended by administrative rule adopted by the commissioner of public service.

(c)  Revision and interpretation of energy standards.  On or about January 1, 2009, and at least every three years thereafter, the commissioner of public service shall amend and update the CBES by means of administrative rules adopted in accordance with 3 V.S.A. chapter 25.  At least a year prior to final adoption of each required revision of the CBES, the department of public service shall convene an advisory committee to include one or more mortgage lenders,; builders,; building designers,; architects; civil, mechanical, and electrical engineers; utility representatives,; and other persons with experience and expertise, such as consumer advocates and energy conservation experts.  The advisory committee may provide the commissioner of public service with additional recommendations for revision of the CBES.

(1)  Any amendments to the CBES shall be:

(A)  Consistent with duly adopted state energy policy, as specified in 30 V.S.A. § 202a.

(B)  Evaluated relative to their technical applicability and reliability.

(2)  Each time the CBES are amended by the commissioner of public service, the amended CBES shall become effective upon a date specified in the adopted rule, a date that shall not be less than three months after the date of adoption.  Persons submitting an application for any state or local permit authorizing commercial construction, or an application for construction plan approval by the commissioner of public safety pursuant to 20 V.S.A. chapter 173, before the effective date of the amended CBES shall have the option of complying with the applicable provisions of the earlier or the amended CBES.  After the effective date of the original or the amended CBES, any person submitting such an application for any state or local permit authorizing commercial construction in an area subject to the CBES shall comply with the most recent version of the CBES.

(3)  The advisory committee convened under this subsection, in preparing for the CBES updates, shall advise the department of public service with respect to the coordination of the CBES amendments with existing and proposed demand‑side management programs offered in the state.

(4)  The commissioner of public service is authorized to adopt rules interpreting and implementing the CBES.

(5)  The commissioner of public service may grant written variances or exemptions from the CBES or rules adopted under this section where strict compliance would entail practical difficulty or unnecessary hardship, or is otherwise found unwarranted, provided that:

(A)  Any such variance or exemption shall be consistent with state energy policy, as specified in 30 V.S.A. § 202a.

(B)  Any petitioner for such a variance or exemption can demonstrate that the methods, means, or practices proposed to be taken in lieu of compliance with the rule or rules provide, in the opinion of the commissioner, equal energy efficiency to that attained by compliance with the rule or rules.

(C)  A copy of any such variance or exemption shall be recorded by the petitioner in the land records of the city or town in which the building is located.

(D)  A record of each variance or exemption shall be maintained by the commissioner, together with the certifications received by the commissioner.

(d)  Certification requirement.  Commercial

(1)  The design of commercial buildings shall be certified by the primary designer as compliant with CBES in accordance with this subsection.  A except as compliance is excused by a variance or exemption issued under subdivision (c)(5) of this section.  If applicable law requires that the primary designer be a licensed professional engineer, licensed architect, or other licensed professional, a member of a pertinent licensed profession shall issue this certification.  Otherwise, a certification may be issued by a builder, a licensed professional engineer, or a licensed architect.  If certification is not issued by a licensed professional engineer or a licensed architect, it shall be issued by the builder.  Any certification shall be accompanied by an affidavit and shall certify that the designer acted in accordance with the designer’s professional duty of care in designing the building, and that the commercial construction meets building was designed in substantial compliance with the requirements of the CBES.  The department of public service will develop and make available to the public a certificate that lists key features requirements of the CBES, sets forth certifying language in accordance with this subdivision and requires disclosure of persons relied upon by the primary designer who have contracted to indemnify the primary designer for damages arising out of that reliance.  Any person certifying under this subdivision shall use this certificate or one substantially like it to certify compliance with CBES satisfy these certification obligations.  Certification shall be issued by completing and signing a certificate and permanently affixing it to the outside of the heating or cooling equipment, to the electrical service panel located inside the building, or in a visible location in the vicinity of one of these three areas.  The certificate shall certify that the building has been constructed in compliance with the requirements of the CBES.  The person certifying under this subsection shall provide a copy of each certificate to the department of public service and shall assure that a certificate is recorded and indexed in the town land records.  A builder may contract with a licensed professional engineer or a licensed architect to issue certification and to indemnify the builder from any liability to the owner of the commercial construction caused by noncompliance with the CBES.  In certifying under this subsection, the certifying person may reasonably rely on one or more supporting affidavits received from other persons that contributed to the design affirming that the portions of the design produced by them were properly certifiable under this subsection.  The certifying person may contract for indemnification from those on which the person relies pursuant to this subdivision (1) against damages arising out of that reliance.  This indemnification shall not limit any rights of action of an aggrieved party.

(2)  The construction of a commercial building shall be certified as compliant with CBES in accordance with this subsection, except as compliance is excused by a variance or exemption issued under subdivision (c)(5) of this section.  This certification shall be issued by the general contractor, construction manager, or other party having primary responsibility for coordinating the construction of the subject building, or in the absence of such a person, by the owner of the building.  Any certification shall be accompanied by an affidavit and shall certify that the subject commercial building was constructed in accordance with the ordinary standard of care applicable to the participating construction trades, and that the subject commercial building was constructed substantially in accordance with the construction documents including the plans and specifications certified under subdivision (1) of this subsection for that building.  The department of public service will develop and make available to the public a certificate that sets forth certifying language in accordance with this subdivision, and that requires disclosure of persons who have been relied upon by the person with primary responsibility for coordinating the construction of the building and who have contracted to indemnify that person for damages arising out of that reliance.  The person certifying under this subdivision shall use that certificate or one substantially like it to satisfy these certification obligations.  Certification shall be issued by completing and signing a certificate and permanently affixing it to the outside of the heating or cooling equipment, to the electrical service panel located inside the building, or in a visible location in the vicinity of one of these three areas.  In certifying under this subdivision, the certifying person may reasonably rely on one or more supporting affidavits received from subcontractors or others engaged in the construction of the subject commercial building affirming that the portions of the building constructed by them were properly certifiable under this subdivision.  The certifying person may contract for indemnification from those on which the person relies pursuant to this subdivision (2) against damages arising out of that reliance. This indemnification shall not limit any rights of action of an aggrieved party.

(3)  Any person certifying under this subsection shall provide a copy of the person’s certificate and any accompanying affidavit to the department of public service.

(4)  A certificate issued pursuant to subdivision (1) of this subsection and a certificate issued pursuant to subdivision (2) of this subsection shall be conditions precedent to issuance by the commissioner of public safety (or a municipal official acting under 20 V.S.A. § 2736) of any final occupancy permit required by the rules of the commissioner of public safety for use or occupancy of a commercial building that is also a public building as defined in 20 V.S.A. § 2730(a).

(e)  Action Private right of action for damages against a certifier.

(1)  Except as otherwise provided in this subsection, a person aggrieved by noncompliance with this section another person’s breach of that other person’s representations contained in a certification or supporting affidavit issued or received as provided under subsection (d) of this section, within ten years after the earlier of completion of construction or occupancy of the affected commercial building or portion of that building, may bring a civil action in superior court against a person who has the an obligation of certifying compliance under subsection (d) of this section alleging breach of the representations contained in that person’s certification.  This action may seek injunctive relief, damages arising from the aggrieved party’s reliance on the accuracy of those representations, court costs, and reasonable attorneys’ fees in an amount to be determined by the court.  As used in this subdivision, “damages” means:

(A)  includes costs incidental to increased energy consumption; and

(B)  labor, materials, and other expenses associated with bringing the structure into compliance with CBES in effect on the date construction was commenced.

(2)  A person’s failure to affix the certification as required by this section shall not be an affirmative defense in such an action against the person.

(3)  The rights and remedies created by this section shall not be construed to limit any rights and remedies otherwise provided by law.

(4)  The right of action established in this subsection may not be waived by contract or other agreement.

(5)  It shall be a defense to an action under this subsection that either at the time of completion or at any time thereafter, the commercial building or portion of building covered by a certificate under subsection (d) of this section, as actually constructed, met or exceeded the overall performance standards established in the CBES in effect on the date construction was commenced.

(f)  Violation of section State or local enforcements.  Any person who falsely certifies knowingly makes a false certification under subsection (d) of this section, or any builder party who fails to certify under subsection (d) of this section when required to do so, shall be subject to a civil penalty of not more than $250.00 per day, up to $10,000.00 for each year the violation continuesEach violation shall constitute a separate offense, and each day that the violation continues shall constitute a separate offense.

(g)  Title validity not affected.  A defect in marketable title shall not be created by a failure to record a variance or exemption pursuant to subdivision (c)(5) of this section, by a failure to issue certification or a certificate, as required under subsection (d) of this section, or by a failure under that subsection to:  affix a certificate; or provide a copy of a certificate to the department of public service; or record and index a certificate in the town records.


* * * Smart Metering * * *

Sec. 7.  SMART METERING INVESTIGATION

(a)  The public service board shall investigate opportunities for Vermont electric utilities cost‑effectively to install advanced “smart” metering equipment capable of sending two‑way signals and sufficient to support advanced time‑of‑use pricing during periods of critical peaks or hourly differentiated time‑of‑use pricing. 

(b)  The scope of the investigation shall include the following:

(1)  The current status of implementing either advanced time‑of‑use rate designs or advanced metering by Vermont utilities.

(2)  Analysis of experience from other state jurisdictions and individual utility experience in planning and implementing programs that promote advanced time‑of‑use rate designs or advanced metering.

(3)  Opportunities for exploring ways to design pilot programs and share experience among Vermont utilities with the deployment of advanced meters and rate designs.

(4)  Analysis of all costs and benefits of installing advanced metering equipment, giving due consideration to the circumstances that differentiate Vermont utilities.

(5)  Analysis of opportunities for reducing rates in the short and long term or mitigating rate impacts of investments in advanced metering and ancillary equipment through advanced time‑of‑use rate designs enabled by these investments.

(6)  Analysis of constraints or barriers to implementing this subsection, or opportunities presented by further deferring plans or commitments toward advanced metering equipment or rates.

(7)  Analysis of all supporting and ancillary equipment, equipment standards, and efficiency programs necessary to ensure that customers are adequately and effectively empowered to use and respond cost‑effectively to price signals made possible through advanced metering equipment.

(c)  After investigation, in utility territories where the board concludes it appropriate and cost‑effective, the board shall require each Vermont utility to file plans for investment and deployment of appropriate technologies and plans and strategies for implementing advanced pricing with a goal of ensuring that all ratepayer classes have an opportunity to receive and participate effectively in advanced time‑of‑use pricing plans.

(d)  By January 15, 2008, the public service board shall report to the senate and house committees on natural resources and energy with regard to interim progress in its investigation and measures already implemented under this section.

(e)  By June 15, 2008, the board shall issue a final report and plan for implementation. 

* * * Conservation Rates * * *

Sec. 8.  30 V.S.A. § 218(b) is amended to read:

(b)  The department of public service shall propose, and the board through the establishment of rates of return, rates, tolls, charges, or schedules shall encourage the implementation by electric and gas utilities of energy‑efficiency and load management measures which will be cost‑effective for the utilities and their customers on a life cycle cost basis.  The board shall approve rate designs to encourage the efficient use of natural gas and electricity, including consideration of the creation of an inclining block rate structure for residential rate customers with an initial block of low‑cost power available to all residences. 

(1)  To implement the requirements of this subsection, the public service board shall host one or more workshops to examine the following:

(A)  the parameters for residential inclining block rate designs;

(B)  alternative rate designs, such as critical peak pricing programs or more widespread use of time‑of‑day rates, that would encourage more efficient use of electricity;

(C)  the possible inclusion of exemptions from otherwise applicable inclining block rates or rate designs to encourage efficiency for situations in which special health needs or another extraordinary situation presents such a significant demand for electricity that the board determines use of those rates would cause undue financial hardship for the customer;

(2)  By June 15, 2008, the board shall issue a report and plan for implementation based upon the results of its investigation.  The plan shall require each retail company to upgrade its rates as necessary to implement  new rate designs appropriate to encourage efficient energy use, which shall include residential inclining block rates, if the board determines that those rates would be appropriate, by a specified date, or as part of its next rate‑related appearance before the board, or according to a timetable otherwise specified by the board.  In implementing these rate designs, the board shall consider the appropriateness of phasing in the rate design changes to allow large users of energy a reasonable opportunity to employ methods of conservation and energy efficiency in advance of the full effect of the changes.

* * * Net Metering * * *

Sec. 9.  30 V.S.A. § 219a is amended to read:

§ 219a.  SELF‑GENERATION AND NET METERING

(a)  As used in this section:

(1)  “Customer” means a retail electric consumer who uses a net metering system.

(2)  “Net metering” means measuring the difference between the electricity supplied to a customer and the electricity fed back by a net metering system during the customer’s billing period:

(A)  using a single, nondemand meter or such other meter that would otherwise be applicable to the customer’s usage but for the use of net metering; or

(B)  on farm or group systems, using multiple meters as specified in this chapter.  The calculation will be made by converting all meters to a nondemand, nontime‑of‑day meter, and equalizing them to the tariffed kilowatt‑hour rate.

* * *

(4)  “Farm system” means a facility of no more than 150 250 kilowatts (AC) output capacity, except as provided in subdivision (k)(5) of this section, that generates electric energy on a farm operated by a person principally engaged in the business of farming, as that term is defined in Regulation 1.175‑3 of the Internal Revenue Code of 1986, from the anaerobic digestion of agricultural products, byproducts, or wastes, or other renewable sources as defined in subdivision (3)(E) of this subsection, intended to offset the meters designated under subdivision (g)(1)(A) of this section on the farm or has entered into a contract as specified in subsection (k) of this section.

(b)  A customer shall pay the same rates, fees, or other payments and be subject to the same conditions and requirements as all other purchasers from the electric company in the same rate‑class, except as provided for in this section, and except for appropriate and necessary conditions approved by the board for the safety and reliability of the electric distribution system.

* * *

(f)  Consistent with the other provisions of this title, electric energy measurement for net metering farm or group net metering systems shall be calculated in the following manner:

(1)  Net metering customers that are farm or group net metering systems may credit on‑site generation against all meters designated to the farm system or group net metering system under subdivision (g)(1)(A) of this section.

(2)  Electric energy measurement for farm or group net metering systems shall be calculated by subtracting total usage of all meters included in the farm or group net metering system from total generation by the farm or group net metering system.  If the electricity generated by the farm or group net metering system is less than the total usage of all meters included in the farm or group net metering system during the billing period, the farm or group net metering system shall be credited for any accumulated kilowatt‑hour credit and then billed for the net electricity supplied by the electric company, in accordance with the procedures in subsection (g) of this section.

(3)  If electricity generated by the farm or group net metering system exceeds the electricity supplied by the electric company:

(A)  The farm or group net metering system shall be billed for the appropriate charges for each meter for that month, in accordance with subsection (b) of this section.

(B)  Excess kilowatt‑hours generated during the billing period shall be added to the accumulated balance with this kilowatt‑hour credit appearing on the bill for the following billing period.

(C)  Any accumulated kilowatt‑hour credits shall be used within 12 months or shall revert to the electric company without any compensation to the farm or group net metering system.  Power reverting to the electric company under this subdivision (3) shall be considered SPEED resources under section 8005 of this title.

(g)(1)  In addition to any other requirements of section 248 of this title and this section and board rules thereunder, before a net metering farm or group net metering system including more than one meter may be formed and served by an electric company, the proposed net metering farm or group net metering system shall file with the board, with copies to the department and the serving electric company, the following information:

(A)  the meters to be included in the farm or group net metering system, which shall be associated with the farm buildings and residences owned or occupied by the person operating the farm or group net metering system, or the person’s family or farm employees, or other members of the group, identified by account number and location;

(B)  a method for adding and removing meters included in the farm or group net metering system;

(C)  a designated person responsible for all communications from the farm or group net metering system to the serving electric company, for receiving and paying bills for any service provided by the serving electric company for the farm or group net metering system, and for receiving any other communications regarding the farm or group net metering system net metering; and

(D)  a binding process for the resolution of any disputes within the farm or group net metering system relating to net metering that does not rely on the serving electric company, the board, or the department.

(2)  The farm or group net metering system shall, at all times, maintain a written designation to the serving electric company of a person who shall be the sole person authorized to receive and pay bills for any service provided by the serving electric company, and for receiving to receive any other communications regarding the farm system, the group net metering system, or net metering.

(3)  The serving utility shall implement appropriate changes to the farm system or group net metering system within 30 days after receiving written notification from the designated person.  However, written notification of a change in the person designated under subdivision (2) of this subsection shall be effective upon receipt by the serving utility.  The serving utility shall not be liable for action based on such notification, but shall make any necessary corrections and bill adjustments to implement revised notifications.

(4)  Pursuant to subsection 231(a) of this title, after such notice and opportunity for hearing as the board may require, the board may revoke a certificate of public good issued to a farm or group net metering system.

(5)  A group net metering system may consist only of customers that are located within the service area of the same electric company.  Various buildings owned by a municipality may constitute a group net metering system.  If it determines that it would promote the general good, the board shall permit a noncontiguous group of net metering customers to comprise a group net metering system.

(h)(1)  An electric company:

(A)  Shall make net metering available to any customer using a net metering system, group net metering system, or farm system on a first‑come, first‑served basis until the cumulative output capacity of net metering systems equals 1.0 2.0 percent of the distribution company’s peak demand during 1996; or the peak demand during the most recent full calendar year, whichever is greater.  The board may raise the 1.0 2.0 percent cap.  In determining whether to raise the cap, the board shall consider the following:

(i)  the costs and benefits of net metering systems already connected to the system; and

(ii)  the potential costs and benefits of exceeding the cap, including potential short and long‑term impacts on rates, distribution system costs and benefits, reliability and diversification costs and benefits;

(B)  Shall allow net metering systems to be interconnected using a kilowatt‑hour meter capable of registering the flow of electricity in two directions or such other comparably equipped meter that would otherwise be applicable to the customer’s usage but for the use of net metering;

(C)  May, at its own expense, and with the written consent of the customer, install one or more additional meters to monitor the flow of electricity in each direction;

(D)  Shall Except as otherwise provided in this section, shall charge the customer a minimum monthly fee that is the same as for other customers of the electric distribution company in the same rate class, but shall not charge the customer any additional standby, capacity, interconnection, or other fee or charge;

(E)  May require a customer to comply with generation interconnection, safety, and reliability requirements, as determined by the public service board by rule or order, and may charge reasonable fees for interconnection, establishment, special metering, meter reading, accounting, account correcting, and account maintenance of net metering arrangements of greater than 15 kilowatt (AC) capacity;

(F)  May charge, if the capacity of the distribution system is insufficient for the designed generation, subject to determination by the board, a reasonable fee to cover the cost of electric company improvements necessary to distribute power;

(G)  May require that all meters included within a farm or group net metering system be read on the same billing cycle;

(H)  May book and defer, with carrying costs, additional incremental costs, to the extent that such costs are not recovered through charges, authorized in subdivisions (D), (E), and (F) of this subdivision (1), directly related to implementing net metering of greater than 15 kilowatt (AC) capacity;

(I)  Shall receive from a farm system, which is designed to produce less energy than the total annual load of the meters identified in subdivision (g)(1)(A) of this section, any tradeable renewable credits for which the farm  system is eligible.  All other farm systems shall retain any tradeable renewable credits for which the farm is eligible;.

(2)  All such requirements shall be pursuant to and governed by a tariff approved by the board and any applicable board rule, which tariffs and rules shall be designed in a manner reasonably likely to facilitate net metering.

* * *

(j)  Notwithstanding the provisions of this section that define a net metering system as being of no more than 15 kilowatts (AC) capacity, the board may allow net metering for up to ten 15 systems per year for customers that produce more than 15 kilowatts (AC) capacity, but do not produce more than 150 250 kilowatts of power and are not farm systems.

(k)  Notwithstanding the provisions of subsections (f) and (g) of this section, an electric company may contract to purchase all or a portion of the output products from a farm or group net metering system, provided:

(1)  the farm or group net metering system obtains a certificate of public good under the terms of subsections (c) and (d) of this section;

(2)  any contracted power shall be subject to the limitations set forth in subdivision (h)(1) of this section;

(3)  any contract shall be subject to interconnection and metering requirements in subdivisions (h)(1)(C) and (i)(2) and (3) of this section;

(4)  any contract may permit all or a portion of the tradeable renewable energy credits for which the farm or group net metering system is eligible to be transferred to the electric company;

(5)  the output capacity of a system may exceed 150 250 kilowatts, provided:

(A)  the contract assigns the amount of power to be net metered;

(B)  the net metered amount does not exceed 150 250 kilowatts; and

(C)  only the amount assigned to net metering is assessed to the cap provided in subdivision (h)(1)(A) of this section.

* * * Temporary Meteorological Stations * * *

Sec. 10.  30 V.S.A. § 246 is added to read:

§ 246.  TEMPORARY SITING OF METEOROLOGICAL STATIONS

(a)  For purposes of this section, a “meteorological station” consists of one temporary tower, which may include guy wires, and attached instrumentation to collect and record wind speed, wind direction, and atmospheric conditions.

(b)  The public service board shall establish by rule or order standards and procedures governing application for, and issuance or revocation of, a certificate of public good for the temporary installation of one or more meteorological stations under the provisions of section 248 of this title.  A meteorological station shall be deemed to promote the public good of the state if it is in compliance with the criteria of this section and the board rules or orders.  An applicant for a certificate of public good for a meteorological station shall be exempt from the requirements of subsection 202(f) of this title.

(c)  In developing rules or orders, the board:

(1)  Shall develop a simple application form and shall require that completed applications be filed with the board, the department of public service, the agency of natural resources, and the municipality in which the meteorological station is proposed to be located.

(2)  Shall require that if no objections are filed within 30 days of the board’s receipt of a complete application and the board determines that the applicant has met all of the requirements of section 248 of this title, the certificate of public good shall be issued for a period that the board finds reasonable, but in no event for more than five years.  Upon request of an applicant, the board may renew a certificate of public good.  Upon expiration of the certificate, the meteorological station and all associated structures and material shall be removed, and the site shall be restored substantially to its preconstruction condition.

(3)  May waive the requirements of section 248 of this title that are not applicable to meteorological stations, including criteria that are generally applicable to public service companies as defined in this title.  The board shall not waive review regarding whether construction will have an undue adverse effect on esthetics, historic sites, air and water purity, the natural environment, and the public health and safety.

(4)  Shall seek to simplify the application and review process, as appropriate, in conformance with this section.

(d)  A proposal for decision shall be issued within five months of when the board receives a completed application for a certificate of public good for the temporary installation of one or more meteorological stations under the provisions of section 248 of this title.

* * * Renewable Energy Pricing and Portfolio Standards * * *

Sec. 11.  30 V.S.A. § 8002(4) is amended to read:

(4)  “New renewable energy” means renewable energy produced by a generating resource coming into service after December 31, 2004.  This may include the additional energy from an existing renewable facility retrofitted with advanced technologies or otherwise operated, modified, or expanded to increase the kwh output of the facility in excess of an historical baseline established by calculating the average output of that facility for the 10‑year period that ended December 31, 2004.  If the production of new renewable energy through retrofitting expansion involves combustion of the resource, the system also must result in an incrementally higher level of energy conversion efficiency or significantly reduced emissions.  For the purposes of this chapter, renewable energy refers to either “existing renewable energy” or “new renewable energy.”

Sec. 12.  30 V.S.A. § 8003 is amended to read:

§ 8003.  RENEWABLE ENERGY PRICING

(a)  Upon petition of an electric company subject to this title, upon request of the department of public service, or on its own initiative, the public service board may approve one or more renewable pricing programs for one or more electric utilities; provided, however, in the case of a municipal plant or department formed under local charter or chapter 79 of this title, or an electric cooperative formed under chapter 81 of this title, any renewable pricing program approved by the board shall also be approved by a majority of the voters of a municipality or cooperative voting upon the question at a duly warned annual or special meeting held for that purpose.  Unless the board finds good cause to exempt a utility, by no later than July 1, 2008, each electric utility, municipal department formed under local charter or chapter 79 of this title, and each electric cooperative formed under chapter 81 of this title shall implement a renewable energy pricing program under this section for its customers, or shall offer customers the option of making a voluntary contribution to the Vermont clean energy development fund established under 10 V.S.A. § 6523.  Such renewable energy pricing programs may include, but are not limited to, tariffs, standard special contracts, or other arrangements whose purpose is to increase the company’s reliance on, or the customer’s support of, renewable sources of energy or the type and quantity of renewable energy resources available.

* * *

(f)  Renewable pricing programs offered by a company shall be available to such customer classes as the board may determine.

(g)  The board shall consider the following factors in deciding whether and upon what conditions to approve a proposed renewable energy pricing program:

(1)  minimization of marketing and administrative expenses;

(2)  auditing or certification of sources of energy or tradeable renewable energy credits;

(3)  marketing and promotion plans;

(4)  effectiveness of the program in meeting the goals of promoting renewable energy generation and public understanding of renewable energy sources in Vermont;

(5)  retention by the program of renewable energy production incentives, tax incentives and other incentives earned or otherwise obtained by energy resources acquired pursuant to or as part of a renewable energy pricing program approved under this section to reduce the cost of any premiums paid under this section; and

(6)  costs imposed on nonparticipating customers arising on account of the implementation of the voluntary renewable energy pricing program.

Sec. 13.  30 V.S.A. § 8004(e) is amended to read:

(e)  In lieu of, or in addition to purchasing tradeable renewable energy credits to satisfy the portfolio requirements of this section, a retail electricity provider in this state may pay to a renewable energy fund established by the public service board the Vermont clean energy development fund established under 10 V.S.A. § 6523 an amount per kilowatt hour as established by the board.  As an alternative, the board may require any proportion of this amount to be paid to the energy conservation fund established under subsection 209(d) of this title.

* * * SPEED Program * * *

Sec. 14.  30 V.S.A. § 8005 is amended to read:

§ 8005.  SUSTAINABLY PRICED ENERGY ENTERPRISE DEVELOPMENT (SPEED) PROGRAM

* * *

(b)  The SPEED program shall be established, by rule, order, or contract, by the public service board by January 1, 2007.  As part of the SPEED program, the public service board may, and in the case of subdivisions (2) and (3) of this subsection shall:

* * *

(2)  allow the developer of a facility that is one megawatt or less, and is a qualifying SPEED resource or a nonqualifying SPEED resource, to sell that power under a long term contract that is established at a specified margin below the hourly spot market price determined by the board to be adequate to promote SPEED resource development while remaining consistent with the principles of least‑cost energy services under section 218c of this title.  For purposes of this section, a long‑term contract should be 15 years or greater unless the board finds good cause for a shorter term;

(3)  encourage Vermont’s retail electricity providers to secure long‑term  contracts, at stable prices, for renewable energy that are anticipated to be below the long‑term market price, over the lives of the projects qualifying SPEED resources.  The board shall create a standard contract price, or a set of maximum and minimum provisions, or both, for qualifying SPEED resources over 1 MW of capacity.  In setting a standard contract price for a qualifying SPEED resource, the board shall consider the goal of developing qualified SPEED resources, least cost provision of energy service under section 218c, and the impact on electric rates.  The board may create a competitive bid process through which to select a portion of those contracts;

* * *

(d)(1)  The public service board shall meet on or before January 1, 2012, and open a proceeding, and issue findings determining to determine the total amount of qualifying SPEED resources that have come into service or are projected to come into service during the period of time between January 1, 2005 and January 1, 2013 been supplied to Vermont retail electricity providers or have been issued a certificate of public good.  If the board finds that the amount of qualifying SPEED resources coming into service during that time or having been issued a certificate of public good after January 1, 2005 and before July 1, 2012 equals or exceeds total statewide growth in electric energy usage retail sales during the period of time between January 1, 2005 and January 1, 2012 that time, and in addition, at least five percent of the 2005 total statewide electric retail sales is provided by qualified SPEED resources, or if it finds that the amount of qualifying SPEED resources equals or exceeds 10 percent of total statewide electric energy usage retail sales for calendar year 2005, the portfolio standards established under this chapter shall not be in force.  The board shall make its determination by July 1, 2012 January 1, 2013.  If the board finds that the goal established has not been met, one year after the board’s determination the portfolio standards established under subsection 8004(b) of this title shall take effect.

(2)  A state goal is to assure that 20 percent of total statewide electric retail sales before July 1, 2017 shall be generated by speed resources.  The public service board shall report to the house and senate committees on natural resources and energy and to the joint energy committee by December 15, 2012 with regard to the state’s progress in meeting this goal.  In addition, the board shall report to the house and senate committees on natural resources and energy and to the joint energy committee by December 15, 2014 with regard to the state’s progress in meeting this goal and, if necessary, shall include any appropriate recommendations for measures that will make attaining the goal more likely.

(3)  For the purposes of the determination to be made under this subsection, electricity produced at all facilities owned by or under long-term contract to Vermont retail electricity providers, whether it is generated inside or outside Vermont, that is new renewable energy shall be counted in the calculations under subdivision subdivisions (d)(1) and (2) of this section.

* * *

* * * Assistance * * *

Sec. 15.  REPORTS ON OMBUDSMAN AND TECHNICAL ASSISTANCE FOR COMMUNITIES

Technical assistance.  By no later than January 15, 2008, the public service department, after consultation with the public service board and the clean energy development fund investment committee established under 10 V.S.A. § 6523(e)(1)(B), shall report to the legislative committees on natural resources and energy with a recommended program by which the state may best:

(1)  Establish and fund an office of ombudsman, which would be charged with assisting those who desire to develop renewable energy projects in dealing with the regulatory process.  In developing the proposal, the department shall consult with the agency of natural resources with respect to how to assist individuals seeking a certificate of public good for a  small hydroelectric facility and those seeking water quality certification, and shall consider how best to coordinate services with the ombudsman for renewable energy at the agency of agriculture, food and markets.

(2)  Establish and fund a program to provide communities with assistance in assessing their renewable energy resources and the potential for development of those resources, and in evaluating, selecting, and implementing reasonable alternatives for financing the construction of those renewable energy resources.

* * * Unanticipated Revenues Surcharge * * *

Sec. 16.  32 V.S.A. §8664 and 8665 are added to read:

§8664 UNANTICIPATED REVENUES SURCHARGE

(a) The General Assembly finds that forces in the electric power market have resulted in unanticipated revenues and benefits to certain generators of electric power not all related to the efficiency of plant operation and management. Changes in market conditions, including large increases in total power sale and revenues due to plant uprates, have increased the profitability of power generators.. The overall rise in the price of fossil fuels provides additional revenues to non-fossil fuel generators.  The new forward capacity market mechanism provides a substantial source of new revenues to power producers.  Across the board increases in wholesale power revenues are likely to be realized from the Regional Greenhouse Gas Initiative carbon cap program to be launched in this region.

(b) The General Assembly further finds that energy users in Vermont have experienced dramatic increases in energy costs and should share equitably in the unanticipated revenues accruing to generators of power in the state.

(c)  It is therefore the purpose of the General Assembly to secure benefits for Vermonters through the creation and funding of an energy affordability investment fund consistent with state energy policy set forth in Section 202a of Title 30.

(d) There is assessed upon electric generating plants in the state having a name plate generating capacity of 100,000 kilowatts, or more, a surcharge upon unanticipated revenues from electric energy generated in the state. 

(e) The amount of the surcharge shall be equal to thirty-five percent of the gross revenues received in each quarter of calendar years 2008, 2009, 2010 and 2011 that is in excess of the amount of gross revenues received in each corresponding quarter of calendar year 2003.  In calendar year 2007, the charge shall be thirty-five percent of the gross revenues received in the third and fourth quarters of the calendar in excess of the amount of gross revenues received in the corresponding quarters of calendar year 2003.  In calendar year 2012, the charge shall be thirty-five percent of the gross revenues received in the period from January 1, 2012 to March 21, 2012 in excess of the amount of gross revenues received in the corresponding period of calendar year 2003.

(f) The unanticipated revenue surcharge imposed by this section shall be paid to and collected by the commissioner of taxes.  Payments shall be made on a quarterly basis, and are due and payable on the last day of the month following the end of each quarter or period.  A person or corporation failing to make returns or pay the charge imposed by this section within the time required shall be subject to and governed by the provisions of sections 3202 and 3203 and subchapters 8 and 9 of chapter 151 of  this title.

(g)  The unanticipated revenue surcharge assessed by this section is in addition to any other state or local tax or charge, including all state and local property taxes, general fund and education fund megawatt taxes, and revenues due pursuant to 10 V.S.A. 6522.

(h) Revenues received from the unanticipated revenues surcharge assessed by this section shall be deposited by the commissioner of  taxes in the Vermont energy affordability investment fund established by section 8665 of this title.

§8665.  VERMONT ENERGY AFFORDABILITY INVESTMENT FUND

     (a)  There is established the Vermont energy affordability investment fund as a special fund to be managed pursuant to the provisions of subchapter 5 of chapter 7 of title 32.

(b)  The fund shall contain all revenues received by the state from the unanticipated revenue surcharge assessed by section 8664 of this title.

(c) Interest and revenues in the fund shall not revert at the conclusion of any fiscal year, but remain in the fund for future fiscal years.

(d) Monies in the fund may be expended only upon appropriation by the General Assembly for purposes consistent with the energy policy of the state set forth in section 202a of Title 30.  

* * * Wind‑Powered Electric Generating Facilities * * *

Sec. 17.  32 V.S.A. § 5401(10)(J) is added to read:

(10)  “Nonresidential property” means all property except:

* * *

(J)  Buildings and fixtures subject to the tax on wind-powered electric generating facilities under section 5402c of this title.

Sec. 18.  32 V.S.A. § 5402c is added to read:

§ 5402c.  WIND-POWERED ELECTRIC GENERATING FACILITIES TAX

(a)  Beginning three years after the facility commences to generate electricity, a facility certified by the commissioner of public service as a facility which produces electrical energy for resale, generated solely from wind power, which has an installed capacity of at least five megawatts, which was placed in service after January 1, 2007, and which holds a valid certificate of public good issued under 30 V.S.A. § 248, shall be assessed an alternative education property tax on its buildings and fixtures used directly and exclusively in generation of electrical energy from wind power.  The tax shall be imposed at a rate of $0.003 per kWh of electrical energy produced by the certified facility, as determined by the public service department for the six months ending April 30 and the six months ending October 31 each year, but in no case shall the tax imposed for any six month period be less than an amount equal to 15% of the installed capacity of the facility multiplied by the rate per kWh imposed by this subsection.  Until a facility is certified under this subsection, it shall remain subject to taxation under section 5402 of this title.

(b)  The tax imposed by this section shall be paid to the commissioner of taxes by the person or entity then owning or operating the certified facility, by December 1 for the period ending October 31 and by June 1 for the period ending April 30, for deposit into the education fund.  A person or entity failing to make returns or pay the tax imposed by this section within the time required shall be subject to and governed by the provisions of sections 3202 and 3203 and subchapters 8 and 9 of chapter 151 of this title.

(c)  Buildings and fixtures subject to the education property tax under this section shall not be taken into account in determining the common level of appraisal for the municipality.

Sec. 19.  MUNICIPAL PROPERTY TAXES UNAFFECTED

Application of alternative education property tax to a wind-powered electric generating facility under 32 V.S.A. § 5402c shall have no effect upon the assessment of municipal taxes upon that facility by any municipality in this state.

* * * Business Energy Credit * * *

Sec. 20.  32 V.S.A. § 5822(c)(1)(B) and (d) are amended to read:

(c)  The amount of tax determined under subsection (a) of this section shall be:

(1)  increased by 24 percent of the taxpayer’s federal tax liability for the taxable year for the following:

* * *

(B)  recapture of federal investment tax credit the Vermont‑property portion of the business energy credit component of the federal investment tax credit recapture for the taxable year; this shall be computed based on the federal investment tax credit as it existed in taxable year 2007;

(d)  A taxpayer shall be entitled to a credit against the tax imposed under this section of 24 percent of each of the credits allowed against the taxpayer’s federal income tax for the taxable year as follows:  elderly and permanently totally disabled credit, investment tax credit the Vermont‑property portion of the business energy credit component of the federal investment tax credit, and child care and dependent care credits. 

Sec. 21.  32 V.S.A. § 5930z is added to read:

§ 5930z.  Pass‑Through of Federal Energy Credit for Corporations

(a)  A taxpayer of this state shall be eligible for a credit against the tax imposed under section 5832 of this title in an amount equal to 24% of the Vermont‑property portion of the business energy credit component of the federal investment tax credit allowed against the taxpayer’s federal income tax for the taxable year under Section 48 of the Internal Revenue Code;

(b)  Any taxpayer who has received a credit under subsection (a) of this section in any prior year shall increase its corporate income tax under this chapter by the amount of 24% of the Vermont‑property portion of the business energy credit component of the federal investment tax credit recapture for the taxable year.

Sec. 22.  EFFECTIVE DATE OF BUSINESS ENERGY TAX CREDITS; PSB REPORT

(a) Secs. 20 and 21 of this act (business energy tax credits) shall apply to taxable years 2008 and after.

(b) By January 15, 2010, the Public Service Board shall report to the General Assembly regarding:

     (1) the utilization and effectiveness of the solar tax credit in promoting the installation by commercial properties in Vermont of customer owned, on site solar electric power, and

     (2) recommendations on any changes to the solar tax credit, including whether it should be restructured to a production based credit, and how many revisions they recommend would be implemented. 

* * * Small Hydro Reports * * *

Sec. 23.  PUBLIC SERVICE BOARD REPORT ON PERMITTING SMALL HYDROELECTRIC PROJECTS

Prior to December 15, 2007, the public service board shall report to the house committee on fish, wildlife and water resources and the senate committee on natural resources and energy with a recommendation for a simple, predictable, and environmentally sound process, other than the process set forth in subsection 248(j) of Title 30, for issuing a certificate of public good under section 248 of Title 30 for small hydroelectric projects that are not eligible for a net metering permit under public service board rule 5.100.  The report shall:

(1)  Recommend criteria for determining what constitutes a small hydroelectric facility, including the allowable maximum amount of output capacity at the facility and the type of eligible facilities, natural features, or other sites.

(2)  Address permit application requirements, including ownership of the facility, interconnection, and structural safety of the small hydroelectric project.

(3)  Address additional uses of the small hydroelectric project such as flood control; fish and wildlife habitat; recreation; water supply; historic resource; and structural grade control for infrastructure, roads, bridges, and houses.

Sec. 24.  AGENCY OF NATURAL RESOURCES REPORT ON WATER QUALITY CERTIFICATION FOR SMALL HYDROELECTRIC PROJECTS

Prior to December 15, 2007, the secretary of natural resources shall report to the house committee on fish, wildlife and water resources and the senate committee on natural resources and energy with a recommendation for a simple, predictable, and environmentally sound procedure for completing a water quality certification review, as required by Section 401 of the federal Clean Water Act, of small hydroelectric projects that are not subject to net metering.  The report shall:

(1)  Recommend, after consultation with the public service board, criteria for determining what constitutes a small hydroelectric facility, including the allowable maximum amount of output capacity at the facility and the type of eligible facilities, natural features, or other sites;

(2)  Address bypass flows for small hydroelectric projects.

(3)  Address the need for monitoring of dissolved oxygen at small hydroelectric facilities.

(4)  Address seasonal flows in bypasses at run‑of‑river facilities. 

(5)  Address the need for new fish or flow studies for small hydroelectric projects. 

(6)  Address the use of flashboards to increase upstream flooding.

(7)  Address measures to prevent fish from entering turbines and penstocks.

(8)  Address the size of authorized diversions and penstocks.

(9)  Include an analysis of the existing permitting process for small hydro projects.


Sec. 25.  PILOT PROJECTS FOR SMALL HYDROELECTRIC GENERATORS

In order to promote the timely development of environmentally sound small community hydro projects, and to help inform efforts to develop new permitting processes, the public service board and the agency of natural resources shall work with communities that are seeking to develop small hydro projects, to facilitate those projects through the existing permit processes.  These projects shall not have more than 2 MW of name-plate capacity, shall have the support and involvement of the communities in which they are located, and shall not include the construction of a new dam.

Sec. 26.  REPORT ON STATUS OF SPEED PROGRAM

By no later than January 15, 2008, the public service board shall report to the legislative committees on natural resources and energy with an evaluation of the likelihood of qualifying SPEED resources coming into service in time to meet the standards established in 30 V.S.A. § 8005(d), as amended by this act.

* * * Plumbing * * *

Sec. 27.  26 V.S.A. § 2173(a) is amended to read:

§ 2173.  RULES ADOPTED BY THE BOARD

(a)  The plumber’s examining board may, pursuant to the provisions of 3 V.S.A. chapter 25 (Administrative Procedure Act), make and revise such plumbing rules as necessary for protection of the public health, except that no rule of the board may require the installation or maintenance in a private residence of a water heater at a minimum temperature.  To the extent that a rule of the board conflicts with this subsection, that rule shall be invalid and unenforceable.  The rules shall be in effect in every city, village, and town having a public water system or public sewerage system and apply to all premises connected to the systems and all public buildings containing plumbing or water treatment and heating specialties whether they are connected to a public water or sewerage system.  The local board of health and the commissioner of public safety shall each have authority to enforce these rules.  The rules shall be limited to minimum performance standards reasonably necessary for the protection of the public against accepted health hazards.  The board may, if it finds it practicable to do so, adopt the provisions of a nationally recognized plumbing code.

Sec. 28.  26 V.S.A. § 2192a (b) is amended to read:

(b)  Specialty fields include the following:

* * *

     (4) Solar System Specialist:  Installation, replacement and repair of residential, industrial or commercial domestic solar heating systems for use as a supplemental or pre-heat source.  Systems shall include; passive or active design, collectors, storage tanks, heat exchangers, piping, safety devices and related materials.  The Solar System Specialist shall only connect to new or existing domestic hot water supply tanks, including instantaneous heaters, as well as tanks or heat exchangers supplementing hydronic space heating systems.  At no time shall a Solar System Specialist install, replace and repair any other part of a domestic hot water supply or hydronic space heating system.

* * *Affordability * * *

Sec. 29.  30 V.S.A. § 218(e) is added to read:

(e)  Notwithstanding any other provisions of this section, the board may approve a rate schedule, tariff, agreement, contract, or settlement that provides reduced rates for low income electric utility consumers to better assure affordability.  For the purposes of this subsection, “low income electric utility consumer” means a customer who has a household income at or below 150 percent of the current federal poverty level.  When considering whether to approve a rate schedule, tariff, agreement, contract, or settlement for low income electric utility consumers, the board may take into account the potential impact on, and cost-shifting to, other utility customers.

* * * Energy Efficiency Services Fund * * *

Sec. 30.  30 V.S.A. § 203a is added to read:

§ 203a.  ENERGY EFFICIENCY SERVICES

(a)  Purpose.  The general assembly finds and determines that:

(1)  it is the policy of the state to assure the efficient use of energy resources and cost‑effective demand management, as specified in section 202a of this title;

(2)  a comprehensive state energy plan, as is specified in section 202b of this title, must be developed to implement this state energy policy;

(3)  it is appropriate to build upon the work in reducing energy costs for Vermonters already done by the existing efficiency utility established under the authority of section 209 of this title, and to integrate that work into a broader program implemented through an expanded energy efficiency utility that will serve the needs of the people of the state in an even better manner;

(4)  current energy efficiency programs are not designed to meet fully the thermal efficiency needs of consumers who rely on heating oil, kerosene, propane, and coal, as they are funded through efficiency charges that are currently assessed only on electricity and natural gas providers regulated by the board;

(5)  with the scientific consensus that global climate change is caused in significant part by human activities that release greenhouse gases into the atmosphere, it is particularly important to reduce the extent to which these emissions result from the inefficient use of carbon‑containing fuels, regardless of the nature of the source;

(6)  it is desirable for the state to lower the risk of high fuel prices and vulnerable supplies, while at the same time strengthening the Vermont economy by establishing a system to promote all forms of energy end‑use efficiency, comprehensive sustainable building design, and integrated renewable energy installations.

(b)  Non-electric energy efficiency fund.  The public service board shall establish an energy affordability investment fund to be managed by a fund administrator appointed by the board under this section and subdivision 209(d)(3) of this title.  The fund shall contain such sums as appropriated by the general assembly or as otherwise provided by law.  Balances in the fund and interest earned shall be carried forward and remain in the fund at the end of each fiscal year.

(c)  Use of the fund.  The non-electric energy efficiency services fund shall be used to support the delivery of energy efficiency services to Vermont heating and process fuel consumers of oil, kerosene, propane, coal, and wood; and to carry out cost‑effective efficiency measures and reductions in greenhouse gas emissions from sectors other than, or in addition to, the regulated electricity and natural gas use sectors.  These energy efficiency services shall be provided by the energy efficiency utility appointed by the board under subsection 209(d) of this title and operating in accordance with section 209  of this title.

(d)  Review of adequacy of the fund. 

(1) On or before January 15, 2011, the public service board shall report to the legislature on the expenditure of funds from the non-electric energy efficiency services fund to meet the public’s needs for energy efficiency services.

(2)  The report shall include a funding adequacy evaluation and funding recommendations which shall be developed through a collaborative process involving representatives of heating fuel dealers, electric and gas utilities, the expanded energy efficiency utility, the department of public service, residential and business consumer representatives, environmental advocates, the building industry, entities currently engaged in delivering weatherization services, and other stakeholders identified by the board. 

(3)  The funding adequacy evaluation shall address:  the need for and availability of alternative revenue sources that may be dedicated to the non‑electric energy efficiency fund; the resources dedicated to energy efficiency purposes provided through electric and natural gas rates; an evaluation of potential cost‑effective energy efficiency investments and programs designed to meet the need for energy services through efficiency or conservation in all customer classes and areas of opportunity; the amount of funding necessary in order to realize all reasonably available, cost‑effective energy efficiency savings; and other factors to assure consistency with the purposes of this section and the goals of section 202a of this title.

(4)  The funding recommendations shall be developed in a manner that accords an appropriate balance among the following objectives:  reducing the size of future heating and process-fuel purchases; reducing the generation of greenhouse gases; providing efficiency and conservation as a part of a comprehensive resource supply strategy; providing the opportunity for all Vermonters to participate in efficiency and conservation programs; providing that residential and commercial sector benefits generally shall be proportional to sector contributions to the extent such proportion can be determined; and targeting efficiency and conservation efforts to locations, markets, or customers where they may provide the greatest value.

 * * * Revised Efficiency Utility Structure * * *

Sec. 31.  REPORT ON REVISED STRUCTURE FOR ENERGY EFFICIENCY UTILITY

By no later than December 15, 2007, the public service board shall present a report to the house and senate committees on natural resources and energy, the senate committee on finance, and the house committee on ways and means that contains a proposed revised energy efficiency utility structure, together with any proposed legislative changes that in its judgment will assist in the effective implementation of the revised efficiency utility.  The  board shall develop the proposal in a manner consistent with the provisions of 30 V.S.A. § 209 and in collaboration with representatives from heating fuel dealers, electric and gas utilities, the energy efficiency utility, the department of public service, consumer representatives, environmental advocates, the building industry, entities currently engaged in delivering weatherization services, and other stakeholders identified by the board.  The report shall include options for ongoing funding of the expanded fossil fuel efficiency responsibilities of the energy efficiency utility.


* * * Existing Efficiency Utility * * *

Sec. 32.  30 V.S.A. § 209 is amended to read:

§ 209.  JURISDICTION; GENERAL SCOPE

* * *

(d)(1)  The public service department, any entity appointed by the board under subdivision (2) of this subsection, all gas and electric utility companies, and the board upon its own motion, are encouraged to propose, develop, solicit, and monitor energy efficiency and conservation programs and measures, including appropriate combined heat and power systems that result in the conservation and efficient use of energy and meet the applicable agency of natural resources' air quality standards.  Such programs and meas­ures, and their implementation, may be approved by the board if it determines they will be beneficial to the ratepayers of the companies after such notice and hearings as the board may require by order or by rule.

(2)  In place of utility‑specific programs developed pursuant to section 218c of this title, the board may shall, after notice and opportunity for hearing, provide for the development, implementation, and monitoring of gas and electric energy efficiency and conservation programs and measures including programs and measures delivered in multiple service territories, by appointing one or more entities appointed by the board for these purposes a qualified entity as an energy efficiency utility.  An appointment of an energy efficiency utility shall be made under this section and section 203a of this title, on a schedule that provides the energy efficiency utility adequate time to prepare for the delivery of relevant services no later than January 1, 2009.  Despite this appointment, however, the board may allow the Burlington Electric Department and the Vermont Gas Systems, Inc., and any successors in interest, to continue to provide efficiency services within their respective service territoriesThe As part of this appointment, the board may shall include as eligible measures appropriate combined heat and power systems that result in the conservation and efficient use of energy and meet the applicable agency of natural resources’ air quality standards.  The Except with regard to a transmission company, the board may specify that the implementation of these programs and measures appointment of an energy efficiency utility to deliver services within an electric utility’s service territory satisfies a that electric utility’s corresponding obligations, in whole or in part, under section 218c of this title and under any prior orders of the board.

(3)  In addition to its existing authority, the board may establish by order or rule a volumetric charge to customers for the support of energy efficiency programs that meet the requirements of section 218c of this title.  The charge shall be known as the energy efficiency charge, shall be shown separately on each customer's bill, and shall be paid to a fund administrator appointed by the board and deposited into an electric efficiency fund.  When such a charge is shown, notice as to how to obtain information about energy efficiency programs approved under this section shall be provided in a manner directed by the board.  This notice shall include, at a minimum, a toll free telephone number, and to the extent feasible shall be on the customer's bill and near the energy efficiency charge.  Balances in the electric efficiency fund shall be ratepayer funds, shall be used to support the activities authorized in this subdivision, and shall be carried forward and remain in the fund at the end of each fiscal year.  These monies shall not be available to meet the general obligations of the state.  Interest earned shall remain in the fund.  The board will annually provide the legislature with a report detailing the revenues collected and the expenditures made for energy efficiency programs under this section.

(4)  The charge established by the board pursuant to subdivision (3) of this subsection shall be in an amount determined by the board by rule or order that is consistent with the principles of least cost integrated planning as defined in section 218c of this title. As circumstances and programs evolve, the amount of the charge shall be reviewed for unrealized energy efficiency potential and shall be adjusted as necessary in order to realize all reasonably available, cost-effective energy efficiency savings. In setting the amount of the charge and its allocation, the board shall determine an appropriate balance among the following objectives; provided, however, that particular emphasis shall be accorded to the first four of these objectives: reducing the size of future power purchases; reducing the generation of greenhouse gases; limiting the need to upgrade the state's transmission and distribution infrastructure; minimizing the costs of electricity; providing efficiency and conservation as a part of a comprehensive resource supply strategy; providing the opportunity for all Vermonters to participate in efficiency and conservation programs; and the value of targeting efficiency and conservation efforts to locations, markets or customers where they may provide the greatest value.  The board, by rule or order, shall establish a process by which a customer may apply to the board for an exemption from some or all of the charges assessed under this subdivision. The board shall establish criteria by which these applications shall be measured. Any such exemption shall extend for a period of time not to exceed one year. In addition, the board may authorize exemptions only if, at a minimum, a customer demonstrates that, during the preceding year, it implemented an extraordinary amount of cost-effective energy efficiency at the customer's own expense or incurred extraordinary costs on those measures and the customer did not and will not receive reimbursement for those measures from the entity designated by the board under this section.

(5)  Effective January 1, 2009, an energy efficiency utility shall have the same unrestricted term of appointment and process for termination of appointment as is most common for electric and gas utilities in the state.

(e)  The board shall:

(1)  Ensure that all retail consumers, regardless of retail electricity or, gas, or heating or process fuel provider, will have an opportunity to participate in and benefit from a comprehensive set of cost‑effective energy efficiency programs and initiatives designed to overcome barriers to participation.

(2)  Require that continued or improved efficiencies be made in the production, delivery, and use of energy efficiency services, including the use of compensation mechanisms for any energy efficiency utility that are based upon verified savings in energy usage and demand, and other performance targets specified by the board.  The linkage between compensation and verified savings in energy usage and demand (and other performance targets) shall be reviewed and adjusted not less than triennially by the board.

(3)  Build on the energy efficiency expertise and capabilities that have developed or may develop in the state.

(4)  Promote program initiatives and market strategies that address the needs of persons or businesses facing the most significant barriers to participation.

(5)  Promote coordinated program delivery, including coordination with low income weatherization programs, other efficiency programs, and utility programs.

(6)  Consider innovative approaches to delivering energy efficiency, including strategies to encourage third party financing and customer contributions to the cost of efficiency measures.

(7)  Provide a reasonably stable multiyear budget and planning cycle and in order to promote program improvement, program stability, enhanced access to capital and personnel, improved integration of program designs with the budgets of regulated companies providing energy services, and maturation of programs and delivery resources.    

(8)  Approve programs, measures, and delivery mechanisms that reasonably reflect current and projected market conditions, technological options, and environmental benefits.

(9)  Provide for delivery of these programs as rapidly as possible, taking into consideration the need for these services, and cost-effective delivery mechanisms.

(10)  Provide for the independent evaluation of programs delivered under subsection (d) of this section and those delivered under section 203a of this title.

(11)  Require that any entity approved appointed by the board under subsection (d) of this section deliver board‑approved programs in an effective, efficient, timely, and competent manner and meet standards that are consistent with those in section 218c of this title, the board’s orders in public service board docket 5270, and any relevant board orders in subsequent energy efficiency proceedings.

(12)  Require verification, on or before January 1, 2003, and every three years thereafter, by an independent auditor of the reported energy and capacity savings and cost-effectiveness of programs delivered by any entity appointed by the board to deliver energy efficiency programs under subdivision (d)(2) of this section and under section 203a of this title.

(13)  Ensure that any energy efficiency program approved by the board shall be reasonable and cost-effective.

(14)  Consider the impact on retail electric rates and bills of programs delivered under subsection (d) of this section and the impact on fuel prices and bills of programs delivered under section 203a of this title.

(15)  Ensure that the energy efficiency utility promotes strategies that shall be designed to make continuous progress by promoting all forms of energy end‑use efficiency and comprehensive sustainable building design. The program may utilize performance‑based compensation.  The program administrator may secure and administer revenue from other sources.

(f)  Appointment of, oversight of, and revenue determinations for such an energy efficiency utility shall fall within the regulatory powers and jurisdiction of the board and, as is the case regarding the regulation of the revenues, terms, and conditions of service and compensation of gas and electric utilities, shall not be considered a contractual activity of the state.

(g)  No later than January 1, 2009, consistent with the provisions of subsections (d),(e), and (f) of this section, the board shall adopt a revised structure for an efficiency utility in order to:

(1)  establish processes for the appointment and revocation of  appointment to serve as the energy efficiency utility similar to those in effect for regulated utilities in Vermont;

(2)  provide for regulatory oversight by the board and the department of public service that is appropriate to the structure and purpose of the expanded energy efficiency utility;

(3)  base some of the expanded energy efficiency utility’s compensation on verified savings in energy usage and demand and on other performance targets specified by the board and consistent with the provisions of section 202a of this title;

(4)  clarify the relationship between the energy efficiency utility and the City of Burlington Electric Department and Vermont Gas Systems, Inc., or any successors in interest, under which the city and the Vermont Gas Systems, Inc., or any successors in interest, may continue to provide some or all energy efficiency services in their respective service territories if approved by the board;

(5)  continue the delivery of electric efficiency programs consistent with the relevant provisions of subsection (e) of this section;

(6)  expand the energy efficiency utility’s responsibilities to include thermal efficiency and the development of comprehensive building efficiency strategies to promote all forms of energy end-use efficiency and comprehensive sustainable building design;

(7)  provide for appropriate notice to customers on means to obtain information about energy efficiency programs approved under this section;

(8)  determine what, if any, regulatory authority over fuel dealers that the board or department of public service, or both, may require in order to implement the expansion of the energy efficiency utility’s responsibilities set forth in this section and section 203a of this title; and

(9)  permit the energy efficiency utility independently to report and recommend to the board, the general assembly, and the public measures and policies intended to achieve the purposes of section 202a of this title, and, more generally, the purposes of this title.

(h)  The public service board may prescribe, by rule or order, standards for the labeling of electricity delivered or intended for delivery to ultimate consumers as to price, terms, sources and objective environmental impacts, along with such procedures as it deems necessary for verification of information contained in such labels.  The public service board may prescribe, by rule or by order, standards and criteria for the substantiation of such labeling or of any claims regarding the price, terms, sources and environmental impacts of electricity delivered or intended for delivery to ultimate consumers in Vermont, along with enforcement procedures and penalties.  When establishing standards for the labeling of electricity, the board shall weigh the cost, as well as the benefits, of compliance with such standards.  With respect to companies distributing electricity to ultimate consumers, the board may order disclosure and publication, not to occur more than once each year, of any labeling required pursuant to the standards established by this subsection. Standards established under this subsection may include provisions for:

* * *

* * * Coordination with Efficiency Utility * * *

Sec. 33.  30 V.S.A. § 218c(b) is amended to read:

(b)  Each regulated electric or gas company shall prepare and implement a least cost integrated plan for the provision of energy services to its Vermont customers.  In preparing the efficiency portion of an integrated plan, a regulated company shall consult with any entity appointed by the board to deliver energy efficiency services under subdivision 209(d)(2) of this title or under section 203a of this title.  Proposed plans shall be submitted to the department of public service and the public service board.  The board, after notice and opportunity for hearing, may approve a company’s least cost integrated plan if it determines that the company’s plan complies with the requirements of subdivision (a)(1) of this section.

* * * Forward Capacity Market Revenues * * *

Sec. 33a.  FORWARD CAPACITY MARKET REVENUES; ENERGY EFFICIENCY UTILITY

Forward capacity market revenues resulting from the activities of the energy efficiency utility of the state (EEU), designated under subsection 209 (d) of Title 30, shall go to the EEU to be used to further the ability to undertake cost effective energy efficiency activities as authorized under that section.

* * * Low Income Weatherization * * *

Sec. 34.  33 V.S.A. § 2501(d)–(i) are added to read:

(d)  This fund shall be used solely for the purpose of funding weatherization services to low income Vermonters.  Borrowing from the fund to provide cash flow assistance to LIHEAP, or enhancement of the LIHEAP program if unmet need is determined to be critical, may be authorized by the general assembly if it is determined that such borrowing will not affect cash flow to the weatherization contractors.  Provisions for repayment of borrowed funds must be made by the end of the fiscal year in which they were borrowed.

(e)  A full annual accounting of the revenues and expenditures of the weatherization trust fund will be provided by the agency of administration to the house and senate committees on appropriations and on natural resources and energy.

(f)  The low income weatherization program will be guided by a five‑year plan that is drafted with the specific purpose of improving continuously the comfort, safety, and affordability in low income housing and to reduce fuel use and greenhouse gas generation in that housing.  The plan shall describe a five‑year strategy, with a three‑year detailed work plan.  Each year, the strategy and the work plan shall be updated by one year.  The initial plan and subsequent updates will be developed by a weatherization oversight committee, working cooperatively with the office of economic opportunity.  The weatherization oversight committee will be composed of:  three representatives, including two representatives of weatherization contractors and one director of a community action program appointed by the Vermont community action directors association; a representative appointed by the energy efficiency utility provided for in 30 V.S.A. § 209; a low income representative appointed by the Vermont low income advocacy council; a representative appointed by the Vermont housing finance agency; a representative of the department of public service; a representative of a local or regional nonprofit land trust that develops affordable housing appointed by the housing and conservation board; a representative from the office of home heating assistance; a member of the Vermont house of representatives, appointed by the speaker of the house; a member of the senate, appointed by the committee on committees of the senate; a representative of renewable energy installers, to be appointed by renewable energy Vermont; a representative with expertise in climate change reduction appointed by the joint energy committee; a representative of the workforce development council; and a representative of the office of economic opportunity.  The office of economic opportunity shall provide support and full drafting assistance to the weatherization oversight committee in the production of this plan and required updates.  

(g)  The initial plan shall be completed and provided to the general assembly by December 20, 2007.  The plan shall include the following:

(1)  A five‑year strategy to ensure stable financing and capacity‑building in the regional weatherization programs, including a plan for ramp‑up of services consistent with sound management practices.

(2)  A full examination of the effect of the federal Department of Energy rules guiding the federal portion of weatherization funds that now also guide the use of state funds, and steps that could be taken with the state funds to expand the number of units served, the comprehensiveness of services offered, and the greenhouse gas reduction effect of the program.  This will include, where appropriate, the potential for revisions in eligibility, both statewide and by region.

(3)  A comprehensive strategy to use the weatherization program to reduce the rapidly increasing annual requirements for LIHEAP funds.

(4)  A full discussion of efficiencies and improved services to be gained in continuing coordination with Efficiency Vermont, with energy efficiency programs of the Burlington electric department and Vermont Gas Systems, Inc., and any successors in interest, and with any other partnerships that could improve the efficiency and effectiveness of the program.

(5)  Full consideration of strategies and documentation that may be required to secure any greenhouse gas cap‑and‑trade revenues for furtherance of the program.

(6)  Strategies for appropriate use of renewable energy technologies to secure long‑term affordability for low income households.

(7)  Financing strategies that might leverage other funds to increase efficiency and renewable energy investment in low income housing.

(8)  Estimation of job training requirements to implement the plan, how they may be met, and the role of weatherization programs in providing training for their own programs and for the expanded efficiency utility program as well.

(9)  A comprehensive plan for evaluation of the program, documentation of savings and other benefits, and regular reporting to the general assembly.

(h)  On or before January 30 of each year, the office of economic opportunity shall make a report to the house and senate committees on appropriations and on natural resources and energy utilizing existing resources within state government available in the office of economic opportunity’s weatherization data management system that compiles performance data available on households weatherized in the past year to include: 

(1)  number of households weatherized;

(2)  average program expenditure per household for energy efficiency;

(3)  average percent energy savings;

(4)  energy and nonenergy benefits combined;

(5)  benefits saved for every dollar spent;

(6)  average savings per unit for heating fuels;

(7)  gallons of oil saved related to equivalent number of homes heated;

(8)  projected number of households to be weatherized in the current program year; and

(9)  projected program expenditures for the current program year ending March 31.

(i)  The office of economic opportunity may implement administrative changes to the operation of the low income weatherization program that are within its authority to make, prior to submitting the plan.  All such changes will be described in the plan.

* * * Energy Planning * * *

Sec. 35.  30 V.S.A. § 202 is amended to read:

§ 202.  ELECTRICAL ENERGY PLANNING

(a)  The department of public service, through the director for regulated utility planning, shall constitute the responsible utility planning agency of the state for the purpose of obtaining for all consumers in the state proper utility service at minimum cost under efficient and economical management consistent with other public policy of the state.  The director shall be responsible for the provision of plans for meeting emerging trends related to electrical energy demand, supply, safety and, conservation, environmental impacts, and continuing reductions in the generation of greenhouse gases in the production or use of energy.

(b)  The department, through the director, shall prepare an electrical energy plan for the state.  The plan shall be for a 20‑year period and shall serve as a basis for state electrical energy policy.  The electric energy plan shall be based on the principles of “least cost integrated planning” set out in and developed under section 218c of this title.  The plan shall include at a minimum:

(1)  an overview, looking twenty 20 years ahead, of statewide growth and development as they relate to future requirements for electrical energy, including patterns of urban expansion, statewide and service area economic growth, shifts in transportation modes, modifications in housing types and design, conservation, environmental impacts, the increasing global importance of continual reductions in the generation of greenhouse gases, and other trends and factors which, as determined by the director, will significantly affect state electrical energy policy and programs;

(2)  an assessment of all energy resources available to the state for electrical generation or to supply electrical power, including among others, fossil fuels, nuclear, hydro‑electric, biomass, wind, fuel cells, and solar energy and strategies for minimizing the economic and environmental costs of energy supply, including the production of pollutants and greenhouse gases, by means of efficiency and emission improvements, fuel shifting, and other appropriate means;

(3)  estimates of the projected level of electrical energy demand, the projected level of pollution, and the projected level of greenhouse gases generated as a byproduct of the generation of electrical energy;

(4)  a detailed exposition, including capital requirements and the estimated cost to consumers, of how such demand shall be met and how the generation of pollutants, including greenhouse gases, may be continually reduced, based on the assumptions made in subdivision (1) of this subsection and the policies set out in subsection (c) of this section; and

(5)  specific strategies for reducing electric rates and for reducing the generation of pollution including greenhouse gases to the greatest extent possible in Vermont over the most immediate five‑year period, for the next succeeding five‑year period, and long‑term sustainable strategies for achieving and maintaining the lowest possible electric rates and generation of pollution including greenhouse gases over the full 20‑year planning horizon consistent with the goal of maintaining a financially stable electric utility industry in Vermont.

(c)  In developing the plan, the department shall take into account the protection of public health and safety; preservation of environmental quality; the potential for reduction of rates paid by all retail electricity customers; the potential for reduction of electrical demand through conservation, including alternative utility rate structures; use of load management technologies; efficiency of electrical usage; utilization of waste heat from generation; and utility assistance to consumers in energy conservation.  The department shall place a premium upon continuing reductions in the generation of pollution, including greenhouse gases.

(d)  In establishing plans, the director shall:

(1)  Consult with:

* * *

(J)  an entity designated to meet the public’s need for energy efficiency services under subdivision 218c(a)(2) of this title or designated under section 203a of this title;

* * *

(2)  To the extent necessary, include in the plan surveys to determine needed and desirable plant improvements and extensions and coordination between utility systems, joint construction of facilities by two or more utilities, methods of operations, and any change that will produce better service or, reduce costs, or reduce pollution, including the generation of greenhouse gases.  To this end, the director may require the submission of data by each company subject to supervision, of its anticipated electrical demand, including load fluctuation, supplies, costs, the generation of pollution including greenhouse gases, and its plan to meet that demand and reduce that pollution including greenhouse gas emissions, together with such other information as the director deems desirable.

(3)  Work in conjunction with the energy efficiency utility designated under subsection 209(d) of this title or under section 203a of this title to develop 20‑year projections for efficiency programs administered by that utility and to incorporate those projections into the state electrical energy plan.

* * *

(f)  After adoption by the department of a final plan, any company seeking board authority to make investments, to finance, to site or construct a generation or transmission facility or to purchase electricity or rights to future electricity, shall notify the department of the proposed action and request a determination by the department whether the proposed action is consistent with the plan.  In its determination whether to permit the proposed action, the board shall consider the department’s determination of its consistency with the plan along with all other factors required by law or relevant to the board’s decision on the proposed action.  If the proposed action is inconsistent with the plan, the board may nevertheless authorize the proposed action if it finds that there is good cause to do so.  To the extent that the inconsistency entails an excessive generation of greenhouse gases, the board may authorize the proposed action only if it finds that there is compelling reason to do so.  The department shall be a party to any proceeding on the proposed action, except that this section shall not be construed to require a hearing if not otherwise required by law.

* * *

Sec. 36.  30 V.S.A. § 202a is amended to read:

§ 202a.  STATE ENERGY POLICY

It is the general policy of the state of Vermont:

(1)  To assure, to the greatest extent practicable, that Vermont can meet its energy service needs in a manner that is adequate, reliable, secure, and sustainable; that assures affordability and encourages the state’s economic vitality, continuing and substantial reductions in the generation of pollution including greenhouse gases, the efficient use of energy resources and cost effective cost‑effective demand side management; and that is environmentally sound.

(2)  To identify and evaluate on an ongoing basis, resources that will meet Vermont’s energy service needs in accordance with the principles of least cost integrated planning; including efficiency, conservation and load management alternatives, wise use of renewable resources, continuing and substantial reductions in the generation of pollution including greenhouse gases, and environmentally sound energy supply.

Sec. 37.  30 V.S.A. § 202b is amended to read:

§ 202b.  STATE COMPREHENSIVE ENERGY PLAN

(a)  The department of public service, in conjunction with other state agencies designated by the governor, shall prepare a comprehensive state energy plan covering at least a 20‑year period.  The plan shall seek to implement the state energy policy set forth in section 202a of this title.  The plan shall include:

(1)  A comprehensive analysis and projections regarding the use, cost, supply, and environmental effects of all forms of energy resources used within Vermont and regarding all pollution including greenhouse gases generated within the state, including the state’s progress in meeting greenhouse gas reduction goals established in 10 V.S.A. § 578.

(2)  Recommendations for state implementation actions, regulation, legislation, and other public and private action to carry out the comprehensive energy plan.

* * *

  * * * Biodiesel * * *

Sec. 38.  USE OF BIODIESEL IN STATE OFFICE BUILDINGS, STATE GARAGES, AND THE STATE VEHICLE FLEET

(a)  Definitions.  As used in this section:

(1)  “Biodiesel blend” means a blend of biodiesel fuel and petroleum diesel fuel or petroleum heating fuel that contains at least two percent biodiesel fuel by volume.

(2)  “Biodiesel fuel” means a renewable, biodegradable, mono alkyl ester combustible liquid fuel derived from vegetable oil or animal fat which meets the American Society for Testing and Materials (ASTM) specification D6751‑02 for Biodiesel Fuel (B100) Blend Stock for Distillate Fuel.

(b)  On or before January 15, 2008, the department of buildings and general services, department of public service, and agency of transportation jointly shall submit a report to the house and senate committees on institutions, the house and senate committees on natural resources and energy, the house and senate committees on transportation, the house and senate committees on agriculture, the house committee on commerce, the house committee on ways and means, and the senate committee on finance with recommendations on increasing the use of biodiesel blends in state office buildings, state garages, and in the state transportation fleet. 

(1)  The portion of the report prepared by the department of buildings and general services shall contain:

(A)  A summary of the current use of biodiesel blends in state office buildings.

(B)  Recommendations on how to increase the use of biodiesel blends in all state office buildings, wherever feasible, to at least five percent biodiesel (B5) by December 31, 2008, and to at least 10 percent biodiesel (B10) by 2012.

(C)  A summary of any obstacles to increasing biodiesel use in state buildings.

(D)  A proposed work plan to increase biodiesel use.

(2)  The portion of the report prepared by the department of public service shall contain:

(A)  A summary of the biodiesel fuel production capacity, storage facilities, and distribution facilities currently available in Vermont.

(B)  Recommendations for increasing biodiesel fuel production, storage facilities, and distribution facilities.

(C)  A summary of current information on the performance of biodiesel blends for use as heating fuel and as a motor vehicle fuel.

(D)  A summary of the national and regional quality assurance and quality control measures in use for blending biodiesel fuel.

(E)  A proposed work plan to increase biodiesel use.

(3)  The portion of the report prepared by the agency of transportation shall contain:

(A)  A summary of the current use of biodiesel blends in state garages and the state transportation fleet.

(B)  Recommendations on how to increase the use of biodiesel blends in state garages and in the state transportation fleet, wherever feasible, to at least five percent biodiesel (B5) by December 31, 2008, and to at least 10 percent biodiesel (B10) by 2012.

(C)  A summary of any obstacles to increasing biodiesel use in state garages and the state transportation fleet.

(D)  A proposed work plan to increase biodiesel use.

(c)  The department of public service, with representatives of the department of buildings and general services and the agency of transportation present, shall conduct at least one public hearing to review the draft report and to solicit comments prior to finalizing the report.

* * * Energy Efficiency Mortgages * * *

Sec. 39.  ENERGY EFFICIENCY MORTGAGES

On or before January 15, 2008, the Vermont housing finance agency and the Vermont economic development authority, respectively, shall report to the house and senate committees on natural resources and energy, the house committee on commerce, and the senate committee on finance regarding the feasibility of establishing programs to support energy efficiency residential and commercial building mortgages of up to 15 percent of the appraised value of a dwelling or commercial building for energy saving improvements, weatherization, or energy efficiency for which the monthly mortgage or loan payment does not exceed the likely reduction in utility and heating costs for the dwelling or commercial building.

* * * Act 250 * * *

Sec. 40.  10 V.S.A. § 6025(f) is added to read:

(f)  The land use panel, in consultation with the efficiency utility established under 30 V.S.A. § 209(d) or § 203a shall adopt rules that update the requirements of subdivision 6086(a)(9)(F) of this title to respond to the evolution of planning in response to climate change and other factors, the development of new and more efficient designs, and increases in fuel prices that lead to shorter payback periods for efficiency measures, and shall thereby assure the updated identification of the best available technology for efficient use or recovery of energy.  Rules adopted under this subsection shall complement building standards accorded presumptive weight under this chapter and shall address areas not covered by those standards.

* * * Transportation * * *

Sec. 41.  STUDY ON INCENTIVES FOR EFFICIENT TRANSPORTATION

(a)  There is established a study committee on incentives for efficient transportation.  The committee shall include a member of the house appointed by the speaker, and a member of the senate appointed by the committee on committees, who jointly shall convene the committee.  In addition, the speaker of the house and the committee on committees shall each appoint a representative of an environmental group.  The governor shall appoint two automobile dealers, one specializing in American‑made automobiles, one specializing in foreign‑made automobiles.  Other members shall include individuals appointed by the governor to represent the tax department, the department of motor vehicles, the tourism industry, a regional transportation organization, a Vermont small business that relies heavily on the use of motor vehicles for its livelihood, the Alliance of Automobile Manufacturers Association, and a Vermont member of the association of automotive engineers.

(b)  By December 15, 2007, the committee shall report to the house and senate committees on natural resources and energy and on transportation, to the house committee on ways and means, and to the senate committee on finance with:

(1)  Recommendations regarding the use of tax and fee incentives and disincentives among and within vehicle weight classes for consumers to purchase fuel efficient and alternative fuel vehicles.

(2)  Recommendations regarding the use of cash subsidies for efficient motor vehicle operation behavior.

(3)  Recommendations regarding state purchase of motor vehicles that favor fuel efficient and alternative fuel vehicles.

(4)  Recommendations for public education regarding efficient transportation.

(5)  Other recommendations regarding the efficient use of transportation services. 

(c)  The committee shall be entitled to administrative support from the  agency of transportation.

(d)  Legislative members shall be entitled to compensation as provided in 2 V.S.A. § 406.  The committee may meet up to four times.

* * * Right to Conserve Energy * * *

Sec. 42.  9 V.S.A. chapter 138 is added to read:

Chapter 138.  Right to CONSERVE ENERGY

§ 4481.  LEGISLATIVE FINDINGS AND PURPOSE

The general assembly finds that prohibiting or limiting the ability of people voluntarily to conserve energy is contrary to the public interest.  It is the purpose of this chapter to encourage energy conservation by discouraging governmental regulations and practices and private contracts which restrict the use of solar collectors, clotheslines, or other energy saving devices, or that impede non-motorized transportation on state and town highways. 

§ 4482.  TRIENNIAL REPORT ON LIMITATIONS ON RIGHT TO CONSERVE ENERGY

By no later than January 1, 2008, and triennially thereafter, the commissioner of housing and community affairs shall report to the house and senate committees on natural resources and energy regarding the extent to which private covenants within the state restrict the use of solar collectors, clotheslines, or other energy saving devices, together with any related recommendations on that issue.

* * * Green Building, Efficiency, and

Renewable Energy Workforce Development * * *

Sec. 43.  GREEN BUILDING, EFFICIENCY, AND RENEWABLE ENERGY WORKFORCE DEVELOPMENT PLAN

(a)  Legislative Findings.  Vermont must implement a comprehensive green building, energy efficiency, and renewable energy workforce development plan in order to fill the well-paying jobs that will stay in Vermont and are essential to meeting the needs of the renewable energy and energy efficiency industry in order to meet our goals in regard to global climate change. 

(b) Workforce development plan.  The commissioner of labor shall develop a green building, energy efficiency, and renewable energy workforce development plan, in consultation with representatives to include the following:  the apprenticeship program; the building trades; the Vermont workforce development council; the association of weatherization contractors; Efficiency Vermont; Vermont Technical College; the association of general contractors; associated industries of Vermont; Vermont businesses for social responsibility; Vermont fuel dealers association; the coalition for workforce solutions; Renewable Energy Vermont; Vermont small business development centers; the  association of vocational-technical schools; the association of adult service coordinators; Vermont green building network; and the green institute for the advancement of sustainability.   

(c)  Contents of plan.  The plan developed under this section shall be included in a written report that shall be presented on or before March 1, 2008 to the house committees on commerce and on ways and means and to the senate committees on economic development, housing and general affairs and on finance.  The plan shall include:

(1)  Comprehensive recommendations for recruiting and training individuals for employment in the green building and renewable energy and energy efficiency fields.  The recommendations shall include goals for secondary and post-secondary schools, other educational institutions, workforce development organizations, and apprenticeship programs.

(2)  Recommendations for expanding certification programs for green builders and designers and installers of energy efficiency and renewable energy devices and systems.

(3)  Recommendations for incorporating energy efficiency and renewable energy training into apprenticeship and other training programs for electricians, plumbers, and other skilled trades persons.

(4)  Curricula for business development training and technical assistance for businesses that include green builders, energy efficiency designers and developers, and manufacturers of renewable energy and energy efficiency products.

(5)  Enhanced training programs for green builders and designers and weatherization professionals, including how to utilize state-of-the-art tools and materials.

Sec. 44.  COMPREHENSIVE ENERGY PLAN UPDATE

As part of the next update to the state comprehensive energy plan required by 30 V.S.A. § 202b, the department of public service shall evaluate and make specific recommendations on:

(1)  How to increase the energy efficiency of Vermont’s built environment, including strategies to increase the efficiency of new and existing residential, commercial, and industrial buildings, including industrial processes.

(2)  How to assure or facilitate the installation of appropriate and substantial weatherization, particularly with regard to multiple dwellings, rental property, and other instances in which the owner may lack incentives to weatherize because energy costs are paid by a tenant; including the advisability of creating weatherization requirements that must be met at the time of sale.

(3)  How to encourage or require better disclosure of building energy efficiency and weatherization leading up to the time of sale of the  building.

And that the bill ought to pass in concurrence with such proposal of amendment.

Thereupon, the bill was read the second time by title only pursuant to Rule 43, and pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Natural Resources and Energy?, Senator Lyons requested and was granted leave to withdraw the proposal of amendment of the Committee on Natural Resources and Energy.

Which was agreed to.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance?, Senator Mullin requested that the question be divided and that Sec. 16 be considered separately.

Which was agreed to

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Secs. 1 through 15 and Secs. 17 through 44?, Senator Coppenrath moved to amend the proposal of amendment of the Committee on Finance by striking out Sec. 18 in its entirety, which was disagreed to on a roll call, Yeas 5, Nays 25.

Senator Coppenrath having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Coppenrath, Doyle, Kitchel, Scott, Starr.

Those Senators who voted in the negative were: Ayer, Bartlett, Campbell, Carris, Collins, Condos, Cummings, Flanagan, Giard, Hartwell, Illuzzi, Kittell, Lyons, MacDonald, Maynard, Mazza, McCormack, Miller, Mullin, Nitka, Racine, Sears, Shumlin, Snelling, White.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Secs. 1 through 15 and Secs. 17 through 44?, Senator Cummings, moved to amend the proposal of amendment of the Committee on Finance in Sec. 18, in §5402c, in the second sentence, by striking out the words “15% of the installed capacity of the facility multiplied by the rate per kWh imposed by this subsection”, and inserting in lieu thereof the words the rate per kWh imposed by this subsection multiplied by the number of kWh that would be generated if the facility operated at a 15% capacity factor

Which was agreed to.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Secs. 1 through 15 and Secs. 17 through 44?, Senator Sears, moved to amend the proposal of amendment of the Committee on Finance, as amended, by striking out Sec. 27 [Plumbing Board rules] in its entirety.

Which was agreed to.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Secs. 1 through 15 and Secs. 17 through 44?, Senator Illuzzi moved to amend the proposal of amendment of the Committee on Finance, as amended, by adding a new section to be numbered Sec. 24a to read as follows:

Sec. 24a.  LEGISLATIVE FINDINGS; EXISTING OUTDOOR WOOD BOILERS GRANDFATHERED; IMPROPER USE; NEW RULE 05-P41 EFFECTIVE MARCH 31, 2008

The general assembly finds:

(1)  confusion and misinformation has caused some current owners of outdoor wood boilers to incorrectly conclude that they may be unable to use their units when Rule 05-P41 goes into effect;

(2)  Rule 05-P41, recently adopted by the agency of natural resources, raises emission standard requirements for new outdoor wood boilers purchased after March 31, 2008, and does not in any way affect Vermonters who currently own outdoor wood boilers, the proper use of which will be grandfathered;

(3)  Rule 05-P41 for new outdoor wood boilers does not take effect until March 31, 2008, thereby giving fair warning to dealers and manufacturers;

(4)  Rule 05-P41 and 10 V.S.A. § 561 (variances) authorizes the secretary of natural resources, on application from an affected party, to extend the implementation date of the rule if the available technology cannot satisfy the air quality standards in the rule; and

(5)  it is unlawful for a person to use an outdoor wood boiler, as it is for other wood-burning equipment, to burn rubber, tires, plastics, common household waste, or hazardous waste of any kind, which when combusted often cause high levels of toxins to be emitted into our communities, in turn resulting in dirty and toxic air with complaints to municipal and state governments, and demands for stricter air quality rules.  See 24 V.S.A. § 2201 (relating to enforcement of solid waste law violations and municipal enforcement) and 10 V.S.A. Chapters 23 and 159 and the rules adopted thereunder (relating to the definitions of solid waste).

Thereupon, pending the question, Shall the proposal of amendment of the Committee on Finance, as amended, be amended as recommended by Senator Illuzzi?, Senator Illuzzi requested and was granted leave to withdraw the proposal of amendment.

Which was agreed to.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Secs. 1 through 15 and Secs. 17 through 44, as amended?, was decided in the affirmative on a roll call, Yeas 27, Nays 2.

Senator Mullin having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Ayer, Bartlett, Campbell, Carris, Collins, Condos, Cummings, Flanagan, Giard, Hartwell, Illuzzi, Kitchel, Kittell, Lyons, MacDonald, Maynard, Mazza, McCormack, Miller, Mullin, Nitka, Racine, Scott, Sears, Shumlin, Snelling, White.

Those Senators who voted in the negative were: Coppenrath, Starr.

The Senator absent and not voting was: Doyle.

     *Senator Coppenrath explained his vote as follows:

     “Thank you Mr. President:

     “I voted against H. 520 because, although I am not opposed to renewable energy and support the development of alternative renewable energy resources, however, I believe it is premature to provide preferential tax treatment for one energy producer over another, especially if the tax incentive steals future revenues from the education fund at the expense of Vermont property tax payers.”

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Sec. 16?, during the debate of the subject Senator Mullin raised a point of order that the remarks of Senator Shumlin were not germane to the question.

The President overruled the point of order and ruled that the debate offered by Senator Shumlin was germane.

Thereupon, pending the question, Shall the Senate propose to the House to amend the bill as recommended by the Committee on Finance in Sec. 16?, was agreed to on a roll call, Yeas 15, Nays 14.

Senator Mullin having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Ayer, Campbell, Carris, Condos, Cummings, Flanagan, Giard, Hartwell, Kittell, Lyons, MacDonald, McCormack, Sears, Shumlin, White.

Those Senators who voted in the negative were: Bartlett, Collins, Coppenrath, Illuzzi, Kitchel, Maynard, Mazza, Miller, Mullin, Nitka, Racine, Scott, Snelling, Starr.

The Senator absent and not voting was: Doyle.

Thereupon, third reading of the bill was ordered on a roll call, Yeas 18, Nays 11.

Senator McCormack having demanded the yeas and nays, they were taken and are as follows:

Roll Call

Those Senators who voted in the affirmative were: Ayer, Campbell, Carris, Condos, Cummings, Flanagan, Giard, Hartwell, Illuzzi, Kittell, Lyons, MacDonald, McCormack, Miller, Racine, Sears, Shumlin, White.

Those Senators who voted in the negative were: Bartlett, Collins, Coppenrath, Kitchel, Maynard, Mazza, Mullin, Nitka, Scott, Snelling, Starr.

The Senator absent and not voting was: Doyle.

Message from the House No. 68

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:

Mr. President:

I am directed to inform the Senate the House has considered a bill originating in the Senate of the following title:

S. 93.  An act relating to miscellaneous changes to education law.

And has passed the same in concurrence with proposals of amendment in the adoption of which the concurrence of the Senate is requested.

The House has considered Senate proposal of amendment to House bill of the following title:

H. 154.  An act relating to stormwater management.

And has concurred therein with proposal of amendment in the adoption of which the concurrence of the Senate is requested.

The House has considered Senate proposal of amendment to House bill of the following title:

H. 521.  An act relating to miscellaneous substantive tax amendments.

And has refused to concur therein and asks for a Committee of Conference upon the disagreeing votes of the two Houses;

And the Speaker has appointed as members of such Committee on the part of the House

                                         Rep. Peterson of Williston

                                         Rep. Otterman of Topsham

                                         Rep. Obuchowski of Rockingham

Message from the House No. 69

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:

Mr. President:

I am directed to inform the Senate the House has passed a bill of the following title:

H. 547.  An act relating to Fiscal Year 2007 supplemental appropriations.

In the passage of which the concurrence of the Senate is requested.

Message from the House No. 70

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:

Mr. President:

I am directed to inform the Senate the House has considered Senate proposal of amendment to House bill of the following title:

H. 537.  An act relating to making appropriations for the support of government.

And has refused to concur therein and asks for a Committee of Conference upon the disagreeing votes of the two Houses;

And the Speaker has appointed as members of such Committee on the part of the House

                                         Rep. Heath of Westford

                                         Rep. Helm of Castleton

                                         Rep. Larson of Burlington

Message from the House No. 71

     A message was received from the House of Representatives by Ms. Wrask, its Second Assistant Clerk, as follows:


Mr. President:

I am directed to inform the Senate the House has considered Senate proposal of amendment to House bill of the following title:

H. 148.  An act relating to the child abuse registry.

And has concurred therein with proposal of amendment in the adoption of which the concurrence of the Senate is requested.

The House has considered Senate proposal of amendment to House bill of the following title:

H. 274.  An act relating to adult foster care.

And has refused to concur therein and asks for a Committee of Conference upon the disagreeing votes of the two Houses;

And the Speaker has appointed as members of such Committee on the part of the House

                                         Rep. Peterson of Williston

                                         Rep. Hunt of Essex

                                         Rep. Donahue of Northfield

Pursuant to the request of the Senate for a Committee of Conference upon the disagreeing votes of the two Houses on Senate bill of the following title:

S. 13.  An act relating to the idling of motor vehicle engines on school property.

The Speaker has appointed as members of such committee on the part of the House

                                         Rep. Hosford of Waitsfield

                                         Rep. Peltz of Woodbury

                                              Rep. McCullough of Williston

Committees of Conference Appointed

H. 296.

     An act relating to potable water supply and wastewater system permitting.

Was taken up.  Pursuant to the request of the House, the President announced the appointment of

                                         Senator Lyons

                                         Senator Ayer

                                         Senator MacDonald

as members of the Committee of Conference on the part of the Senate to consider the disagreeing votes of the two Houses.

H. 313.

     An act relating to the administration and enforcement of fines within the judicial bureau.

Was taken up.  Pursuant to the request of the House, the President announced the appointment of

                                         Senator Sears

                                         Senator Campbell

                                         Senator Cummings

as members of the Committee of Conference on the part of the Senate to consider the disagreeing votes of the two Houses.

Adjournment

On motion of Senator Shumlin, the Senate adjourned until eleven o’clock in the morning.

 

 

 



Published by:

The Vermont General Assembly
115 State Street
Montpelier, Vermont


www.leg.state.vt.us